LPA Audit
-
Area Audited
-
Conducted on
-
Prepared by
-
Part Number (If applicable):
-
Shift:
Level 1 Audit
-
Verify workstation is free from trip hazards. (cords, wires, etc)
-
Are there any unidentified parts on the floor, under the table, or in unmarked boxes or totes?
-
Is the area free from labels, components, resin, & packaging not directly related to the current job?
-
Is robot dropping parts on the floor vs table/conveyor?
-
Is the PQS correct & up to date? (Verify revision level, customer part number, etc.)
-
Is the NPIF correct & up to date? (Verify revision level, box / tote number, SNP, etc)
-
Has the production report been completed accurately?
-
Are there any gages called out on PQS?
-
Are those gages within calibration date range?
-
Sample 5 pieces (Click the check box to continue)
-
Does sample 1 meet PQS requirements?
-
Does sample 2 meet PQS requirements?
-
Does sample 3 meet PQS requirements?
-
Does sample 4 meet PQS requirements?
-
Does sample 5 meet PQS requirements?
-
Are there any active quality alerts for the part running?
-
Has the operator been trained / made aware of that alert?
-
Are all documents at the workstation controlled? (Document number and revision level)
-
Has the operator been trained to LVG-WI-PROD-0033 General Molding Practices?