1.0 - Administration and Documentation

  • 1.1 - Has the last inspection been reviewed?

  • 1.2 - Are there any outstanding actions?

  • 1.3 - Are there relevant posters on display around site ( please indicate which)

  • 1.4 - Is there a current induction register on site and up to date

  • 1.41 - Are the signing in sheets kept up to date

  • 1.42 - Is there an up to date PUWER register on site

  • 1.43 - Is there an up to date LOLER register on site

  • 1.44 - Are weekly scaffold inspects tags up to date and in place

  • 1.45 - Is there a register of current First Aiders on site

  • 1.46 - Is there a copy of the company Policy on display signed and dated

  • 1.47 - Are all operative training records up to date and held on site

  • 1.5 - Is there evidence of PAT testing being up to date

  • 1.6 - Are COSHH sheets up to date and on site

2.0 - Training & Compentency

  • 2.1 - Have all the current scaffold crew read and signed the current risk assessment

  • 2.2 - Have all the current tradesmen read and signed the current risk assessment

  • 2.3 - Have all the current scaffold crew read and signed the current method statement2.1 - Have all the current scaffold crew read and signed the current risk assessment

  • 2.4 - Have all the current tradesmen read and signed the current method statements

  • 2.5 - What training certification do current tradesmen hold

3.0 - Information, Instruction

  • 3.1 - How frequent are toolbox talks been carried out

  • 3.2 - When was the last toolbox talk

  • 3.3 - Who carried out the last toolbox talk

  • 3.4 - What was the topic of the last toolbox talk given

  • 3.5 - Is the risk and method statement relevant to the current tasks?

4.0 - Material storage and housekeeping

  • 4.1 - Was there evidance of good stacking and storage practices observed

  • 4.2 - Access ways kept clear

  • 4.3 - Have storage areas been kept clean and tidy ( if answer no, please provide further details)

  • 4.4 - Are hazardous substances properly stored

5.0 - Vehicle Movement controls

  • 5.1 - Traffic routes sufficient for safe and easy movement

  • 5.2 - Vehicles and pedestrians segregated

  • 5.3 - Designated loading areas clearly marked out

  • 5.4 - Pedestrian routes clearly marked out

6.0 - Work At Height

  • 6.1 - Is the scaffolding task being carried out in accordance NASC SG4:10 with the use of the advanced guardrail system

  • 6.2 - Is there evidence of adopted of tunnelling technique for raising the boards from below

  • 6.3 - Vehicle base fall protection installed around the lorry bed

  • 6.4 - Rescue plan in place and relevant to the scope of works

7.0 - Fall Protection Equipment

  • 7.1 - Is there evidance of three-montly inspection and recording of fall arrest equipment up to date.

  • 7.2 - Number of harnesses or lanyards that have failed inspections in the last month

8.0 - Welfare

  • 8.1 - Eating facilities are clean and tidy with sufficient seating

  • 8.2 - Toilet facilities are clean and tidy

  • 8.3 - Toilet facilities with soap, hand towels, hot and cold water

  • 8.4 - Facilities to dry wet clothing

  • 8.5 - Secure facilities for own clothing and work wear

  • 8.6 - Kettle and means of heating food

  • 8.7 - Are first aid contents regularly checked and any expired items replaced

  • 8.8 - Employees aware of location of first aid boxes/cabinet and who First Aiders are

9.0 - Scaffolding

  • 9.1 - Is the scaffold erected in accordance with NASC TG20:08 (basic scaffolds) or design

  • 9.2 - Are there sufficient number of ties, using correct fittings, and across two standards

  • 9.3 - Are the ladders secured at both stiles, correct angle and in good order

  • 9.4 - Are all the platform fully boarded with guardrails correctly fixed

  • 9.5 - Are trapdoors/gates or barriers at key ladder access points

  • 9.6 - Have alarms been inspected

10.0 - Signage

  • 10. 1 - Standard safety signage posted at the key locations (incomplete & do not use)

  • 10. 2 - Is the scaff tag signed and displaying the relevant date

  • 10. 3 - Are current site First Aid personnel identified and displayed on notification boards

  • 10. 4 - Are site rules on display

11.0 - Material control

  • 11. 1 - Company procedures for checking, maintaining plant & equipment being implemented

  • 11.2 - Safe stacking practices observed

  • 11.3 - Safe storage of materials observed.

  • 11.4 - Proper number of works for each operation

  • 11.5 - Crane operator logs kept up to date

  • 11.6 - Employees kept from under suspended loads

  • 11.7 - Chains and slings inspected and tagged as required

12.0 - Personal Protective Equipment - Sufficient and Correct applied

  • 12.1 - Hard hat

  • 12. 2 - Gloves (various types for site conditions)

  • 13. 3 - Ear protection

  • 13. 4 - Eye protection

  • 13. 5 - High Visibility vest or garment

  • 13.6 - Harness & Lanyard correctly applied and adjusted

14.0 - Lifting operations

  • 14.1 - Gin wheel correctly position, no greater than 750mm

  • 14.2 - Is the area below the lifting point cordoned off

  • 14.3 - Does the users have knowledge of knots

  • 14.4 - Is the rope and wheel free from defects and suitable

15.0 - Accidents and Near Misses

  • 15.1 - Number of near misses in the last month

  • 15.2 - Have there been any non-reportable accidents within the last month ( if yes please provide details)

  • 15.3 - Have there been any reportable accidents within the last month ( if yes please provide details)

16.0 - Plant and Mechanical

  • 16.1 - Are they kept clean and tidy

  • 16.2 - Guards in good condition

  • 16.3 - Waste/off cuts removed and disposed/stored safely

  • 16.4 - Correct ergonomics for use with plant and mechanical

  • 16.5 - Operators trained/inducted on operation of the machines by a component person

  • 16.6 - Are gas bottles secured

17.0 - Chemical Safety

  • 17.1 - Hazardous Substance Registered up to date and available

  • 17.2 - Material Safety Data Sheets available for all chemicals

  • 17.3 - Risk assessments completed for hazardous substances

  • 17.4 - All containers labelled correctly

  • 17.5 - Do special storage conditions apply

18.0 - Trenches, Excavation and Shoring

  • 18.1 - Competent person identified and present

  • 18.2 - Excavations are shored and slop back

  • 18.3 - Materials are stored at least 1m away from tench

  • 18.4 - Ladders provide every 7m in trench

19.0 - Welding and Burning

  • 19.1 - Gas cylinders stored upright

  • 19.2 - Proper separating distances between fuels and oxygen

  • 19.3 - Goggle, shields and heat gloves used where necessary

  • 19.4 - Fire extinguishes readily available

  • 19.5 - Hot works permits have been used

20.0 - Concrete works

  • 20.1 - Employees are protected from cement dust

  • 20.2 - Exposed skin covered

  • 20.3 - Runaway are adequate

Sign Off

  • Any other comments

  • Auditor's signature

  • Signature of senior manager

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.