Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
1.0 - Administration and Documentation
-
1.1 - Has the last inspection been reviewed?
-
1.2 - Have all outstanding items been dealt with?
-
1.3 - Are there relevant posters on display around site ( please indicate which)
- F10
- Traffic Management Plan
- Emergency Evacuation Plan
- Health and Safety Law
- Fire Points and Assembly
-
1.4 - Is there a current induction register on site and up to date
-
1.41 - Are the signing in sheets kept up to date
-
1.42 - Is there an up to date PUWER register on site
-
1.43 - Is there an up to date LOLER register on site
-
1.44 - Are weekly scaffold inspects tags up to date and in place
-
1.45 - Is there a register of current First Aiders on site
-
1.46 - Is there a copy of the Company Policies available / on display signed and dated?
-
1.47 - Are all operative training records up to date and held on site
-
1.5 - Is there evidence of PAT testing being up to date
-
1.6 - Are COSHH sheets up to date and on site
-
1.71 - Is there a RAMS register on site?
-
1.72 - Is the RAMS register up to date?
-
1.73 - Are all the RAMS available to operatives and have they been signed by all those concerned?
2.0 - Training & Compentency
-
2.1 - Have all the current scaffold crew read and signed the current risk assessment
-
2.2 - Have all the current tradesmen read and signed the current risk assessment
-
2.3 - Have all the current scaffold crew read and signed the current method statement2.1 - Have all the current scaffold crew read and signed the current risk assessment
-
2.4 - Have all the current tradesmen read and signed the current method statements
-
2.5 - What training certification do current tradesmen hold
- Manual Handling
- Abrasive Wheel
- Working at height
- First Aid At Work
- Site Supervisor Safety
- S.M.S.T.S.
- IOSH
- TG20:08 SG4:10 Awareness Course
- Asbestos Awareness
- Asbestos Removal
- Plant Training (e.g. excavator,dumper)
-
2.61 - Percentage of tradesmen holding manual handling training
-
2.62 - Percentage of tradesmen holding working at heights training
-
2.63 - Percentage of tradesmen holding asbestos awareness training
-
2.64 - Percentage of tradesmen with all manual handling, working at heights and asbestos awareness training?
3.0 - Information, Instruction
-
3.1 - How frequent are toolbox talks been carried out
-
3.2 - When was the last toolbox talk
-
3.3 - Who carried out the last toolbox talk
-
3.4 - What was the topic of the last toolbox talk given
-
3.5 - Is the risk and method statement relevant to the current tasks?
4.0 - Material storage and housekeeping
-
4.1 - Was there evidance of good stacking and storage practices observed
-
4.2 - Access ways kept clear
-
4.3 - Have storage areas been kept clean and tidy ( if answer no, please provide further details)
-
4.4 - Are hazardous substances properly stored
-
4.5 - Are COSHH data sheets been completed for all hazardous materials?
5.0 - Vehicle Movement controls
-
5.1 - Traffic routes sufficient for safe and easy movement
-
5.2 - Vehicles and pedestrians segregated
-
5.3 - Designated loading areas clearly marked out
-
5.4 - Pedestrian routes clearly marked out
6.0 - Work At Height
-
6.1 - Is the scaffolding task being carried out in accordance NASC SG4:10 with the use of the advanced guardrail system
-
6.2 - Is there evidence of adopted of tunnelling technique for raising the boards from below
-
6.3 - Vehicle base fall protection installed around the lorry bed
-
6.4 - Rescue plan in place and relevant to the scope of works
7.0 - Fall Protection Equipment
-
7.1 - Is there evidance of three-montly inspection and recording of fall arrest equipment up to date.
8.0 - Welfare
-
8.1 - Eating facilities are clean and tidy with sufficient seating
-
8.2 - Toilet facilities are clean and tidy
-
8.3 - Toilet facilities with soap, hand towels, hot and cold water
-
8.4 - Facilities to dry wet clothing
-
8.5 - Secure facilities for own clothing and work wear
-
8.6 - Kettle and means of heating food
-
8.7 - Are first aid contents regularly checked and any expired items replaced
-
8.8 - Employees aware of location of first aid boxes/cabinet and who First Aiders are
9.0 - Scaffolding
-
9.1 - Is the scaffold erected in accordance with NASC TG20:08 (basic scaffolds) or design
-
9.2 - Are there sufficient number of ties, using correct fittings, and across two standards
-
9.3 - Are the ladders secured at both stiles, correct angle and in good order
-
9.4 - Are all the platform fully boarded with guardrails correctly fixed
-
9.5 - Are trapdoors/gates or barriers at key ladder access points
-
9.6 - Have alarms been inspected
10.0 - Signage
-
10. 1 - Standard safety signage posted at the key locations (incomplete & do not use)
-
10. 2 - Is the scaff tag signed and displaying the relevant date
-
10. 3 - Are current site First Aid personnel identified and displayed on notification boards
-
10. 4 - Are site rules on display
11.0 - Material control
-
11. 1 - Company procedures for checking, maintaining plant & equipment being implemented
-
11.2 - Safe stacking practices observed
-
11.3 - Safe storage of materials observed.
-
11.4 - Proper number of works for each operation
-
11.5 - Crane operator logs kept up to date
-
11.6 - Employees kept from under suspended loads
-
11.7 - Chains and slings inspected and tagged as required
12.0 - Personal Protective Equipment - Sufficient and Correct applied
-
12.1 - Hard hat
-
12. 2 - Gloves (various types for site conditions)
-
13. 3 - Ear protection
-
13. 4 - Eye protection
-
13. 5 - High Visibility vest or garment
-
13.6 - Harness & Lanyard correctly applied and adjusted
14.0 - Lifting operations
-
14.1 - Gin wheel correctly position, no greater than 750mm
-
14.2 - Is the area below the lifting point cordoned off
-
14.3 - Does the users have knowledge of knots
-
14.4 - Is the rope and wheel free from defects and suitable
15.0 - Accidents and Near Misses
-
15.2 - Have there been any non-reportable accidents within the last month ( if yes please provide details)
-
15.3 - Have there been any reportable accidents within the last month ( if yes please provide details)
16.0 - Plant and Mechanical
-
16.1 - Are they kept clean and tidy
-
16.2 - Guards in good condition
-
16.3 - Waste/off cuts removed and disposed/stored safely
-
16.4 - Correct ergonomics for use with plant and mechanical
-
16.5 - Operators trained/inducted on operation of the machines by a component person
-
16.6 - Are gas bottles secured
17.0 - Chemical Safety
-
17.1 - Hazardous Substance Registered up to date and available
-
17.2 - Material Safety Data Sheets available for all chemicals
-
17.3 - Risk assessments completed for hazardous substances
-
17.4 - All containers labelled correctly
-
17.5 - Do special storage conditions apply
18.0 - Trenches, Excavation and Shoring
-
18.1 - Competent person identified and present
-
18.2 - Excavations are shored and slop back
-
18.3 - Materials are stored at least 1m away from tench
-
18.4 - Ladders provide every 7m in trench
19.0 - Welding and Burning
-
19.1 - Gas cylinders stored upright
-
19.2 - Proper separating distances between fuels and oxygen
-
19.3 - Goggle, shields and heat gloves used where necessary
-
19.4 - Fire extinguishes readily available
-
19.5 - Hot works permits have been used
20.0 - Concrete works
-
20.1 - Employees are protected from cement dust
-
20.2 - Exposed skin covered
-
20.3 - Runaway are adequate
Sign Off
-
Any other comments
-
Auditor's signature
-
Signature of Senior Manager / Director