Title Page
-
Site Name
-
Start of installation
-
End of installation
-
Prepared by
-
Personnel
Indoor installation
-
Baseband screws are tightened
-
Baseband is connected to earth bar
-
TRM optical cable installed in flexible.
-
SFP 65/2 connected to 1800 and 47/2 connected to 800
-
DC cables well connected to SPDs
-
Fiber optic cables labeled
-
TRM fiber cable is labeled (From both sides)
-
DC cables labeled (PDU,SPD,Breakers)
-
Winder boxes labeled (Band and Sectors)
-
Zoomed out photos of the cabinet
-
Zoomed in photos of the baseband installaltion
-
Photo of the SPDs
-
Photo of DC breakers/PDUs
-
Remark
-
Remark pictures
Outdoor installation
-
RRUs are installed as per the standard (IF NOT, fill in the Advised by)
-
Advised By:
-
RRUs are connected to earth bar
-
Earth kit for DC cables is done
-
Fiber and DC cables installed on cable clamps
-
DC and Fiber cables are installed separately
-
Earth cables are well tightened
-
800 jumpers are connected to antenna ports and well tightened
-
1800 jumpers are connected to antenna and well tightened
-
Jumpers are well isolated (Upward)
-
Power cables are well isolated
-
RRUs are labeled with sector number
-
Fiber optic cables are labeled
-
DC cables are labeled
-
Cable tray is closed with metallic tie-wraps
-
Zoomed out photos of sector 1
-
Zoomed IN photos of sector 1
-
Zoomed out photos of sector 2
-
Zoomed in photos of sector 2
-
Zoomed out photos of sector 3
-
Zoomed IN photos of sector 3
-
Photo of cable tray
-
Photo of all installed cabinets
-
Name of the NOC person when leaving the site
-
Remark
-
Remark pictures