Title Page
-
Site Name
-
Start of installation
-
End of installation
-
Prepared by
-
Personnel
Radio Indoor installation
-
DUs screws are tightened
-
DUs are connected to earth
-
Cabinet connected to earth
-
Alarm cables are installed
-
DC cables well connected to SPDs
-
Fiber optic cables labeled
-
RRUs power cables labeled (SPD and PDU/Breaker side)
-
DUs power cable labeled (From both side)
-
Winder boxes labeled (Band and Sectors)
-
Zoomed out photo of the cabinet
-
Zoomed in photo of the baseband installaltion
-
Photo of the SPDs
-
Photo of DC breakers/PDUs
-
Remark
-
Remark pictures
Radio Outdoor installation
-
Value of breaker connected to RBS
-
RRUs are installed as per the standard (IF NOT, fill in the Advised by)
-
Advised By:
-
RRUs are connected to earth
-
Earth kit for DC cables is done
-
Fiber and DC cables installed on cable clamps
-
DC and Fiber cables are installed separately
-
Earth cables are well tightened
-
Power cables connector is well isolated
-
Jumpers are well isolated (Upward)
-
RRUs are labeled with sector number
-
Fiber optic cables are labeled
-
DC cables are labeled
-
Cable tray is closed with metallic tie-wraps
-
Zoomed out photo of sector 1
-
Zoomed IN photo of sector 1
-
Zoomed out photo of sector 2
-
Zoomed in photo of sector 2
-
Zoomed out photo of sector 3
-
Zoomed IN photo of sector 3
-
Photo of cable tray
-
Photo of all installed cabinets
-
Remark
-
Remark pictures