Title Page
-
Site name
-
Conducted on
-
Prepared by
Integration checklist
-
Print screen of VLAN configuration
-
External node configured on
-
Print screen of external node configuration
-
800 RRUs powered off (if only 1800 are connected)
-
Site integrated succesfully
-
NOC person name called when leaving the site
-
SRS test done?If not,mention why
-
Remark
-
Remark pictures
Auditing
-
LTE IP printed
-
Fiber cables labeled
-
TRM fiber cable labeled (From both sides)
-
EC cable labeled
-
Baseband DC cable labeled (From both sides)
-
RRUs DC cables labeled (From both sides)
-
Cabinet's pictures after labeleling
-
Installation remark
-
Remark pictures