Title Page

  • Site name

  • Conducted on

  • Prepared by

Integration checklist

  • Print screen of VLAN configuration

  • External node configured on

  • Print screen of external node configuration

  • 800 RRUs powered off (if only 1800 are connected)

  • Site integrated succesfully

  • NOC person name called when leaving the site

  • SRS test done?If not,mention why

  • Remark

  • Remark pictures

Auditing

  • LTE IP printed

  • Fiber cables labeled

  • TRM fiber cable labeled (From both sides)

  • EC cable labeled

  • Baseband DC cable labeled (From both sides)

  • RRUs DC cables labeled (From both sides)

  • Cabinet's pictures after labeleling

  • Installation remark

  • Remark pictures

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.