Title Page
-
Site
-
Prepared by
-
Start of installation
-
End of installation
-
Personnel
Outdoor installation ( NearEnd and FarEnd)
-
Installation done as per SID
-
Antenna is reachable
-
Antenna screws well tightened
-
RAU screws well tightened
-
RAU connected to earth
-
IF cable sealed
-
Cables routed correctly to cable tray
-
Polarization marked on ANTENNA
-
IF cable labeled
-
Zoom out and Zoom In pictures of microwaves
-
Remark
-
Remark pictures
Indoor installation
-
AMM connected to earth
-
All modules screws are well tightened
-
Power taken from 2 different sources
-
IF connector checked
-
Power cables labeled (From both sides)
-
Ethernet/Fiber cable labeled
-
Remark
-
Remark pictures