Information

  • Circuit #

  • Job Type

  • Job Call ID

  • Date of Installation

  • Location
  • Technician

Overview Picture of Location

  • Location Photo

  • Address

Referral

  • Is customer interested in new additional services?

Telus 5 Star Program

  • Did you receive a call from the technician prior to their arrival at your home?

  • Was the Technician on Time?

  • If the Technician was late did they inform you?

  • Did the Technician introduce theirselves upon arrival at your home?

  • Did the Technician provide a business card?

  • Did the Technician review their work plan with you?

  • Did the Technician keep you informed or provide updates during their visit?

  • Did the Technician tell you when they were finished?

  • Did the Technician clean up their mess?

  • Did the Technician provide information on Telus products and services?

Customer Experience

  • How would you rate the overall performance of the Technician that visited you home?

  • Did the Technician proved the customer with a welcome package?

  • Did the Technician educate the customer on their new services?

  • Where there any additional charges?

  • Customer advised of applicable billing (were charged)

Central Office / Remote / Sac / JWI

  • Were The jumpers run correctly? (CF is missing or an incorrect Assignment)

  • Correct ports used?

  • Photo (Central Office / Remote / Sac / JWI

  • Comments

Pedestal / Tub / RA

  • Clear Capped ?

  • Fuse link installed?

  • Correct Clearances from Power?

  • Photos /Pedestal / Tub/ RA

  • Comments

Aerial Drop

  • Drop over messenger on Road Side Crossing?

  • Correct Sag?

  • Correct Hardware?

  • Aerial Tresspass?

  • Correct Clearances?

  • Drop clear of splices?

  • Correct cable used?

  • Type of Cable Used

  • Photos of Drop

  • Comments

Building Contact / Protector to Demarcation

  • Correct box or housing ?

  • Correct protector?

  • Correct attachment to building ( mast, weather head, conduit)

  • Protector Bonding and grounding correct? <br><br>#14 - 1 Circuit<br>#12 - 2 Circuit<br>#10 - 6 Circuit<br>#6 - 7 Circuits or more

  • Underground Sheath Bonding and Grounding Correct?

  • Proper Pots Splitter Installed ?

  • Pot Splitter Installed Correctly? (Doesn't interfere with alarm of intercom ?)

  • Jumper Correctly? (Termination point, bunching block, customer connection panel)

  • Drip loops proper?

  • Proper sealant of entry holes?

  • Proper size holes?

  • Correct location for point of entry?

  • Photos

  • Comments

Inside Beyond Demarcation

  • Set runs hidden where possible?

  • Proper category of wiring?

  • Are proper jacks / wall plates installed?

Internet Service

  • Was the customer provided the wireless details?

  • Was the modem installed in a suitable location?

  • Was a Blast Test done?

IPTV

  • Coax ends properly tightened?

  • Coax Ends Replaced ?

  • Correct splitter used?

  • Correct use of splitters?

  • Terminated correctly?

  • CATV drop disconnected from any HPNA Splitter?

  • Remote programmed for TV?

  • STB installed correctly for optimal picture and audio quality ( best choice of cable) ?

  • STB's have stickers with registration codes?

  • Was a Kit Test run?

  • Photos

  • Comments

Records Update, Ticket Handling, Test Results

  • Proper comments provided?

  • Comments

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.