Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Lutron blind installation and ATP
Lutron blind installation and ATP
-
Room working in?
-
Number of roller blinds/curtains/tensioned shades?
-
BWIC - Is ceiling pocket accessible and prepared with Lutron blind cable presented?
-
Mount sub-brackets to pocket. Use fabric alignment holes to postion the sub-bracket right to left. The fabric alignment holes will line up with the outside edge of the shade tube. Note: Fabric edge may not line up with the edge of tube.
-
Wire 4-pin terminal block.
-
Mount shade to sub-bracket.
-
Center and secure shade.
-
Adjust shade level.
-
Connect terminal blocks.
-
Secure and check the shade. Use the programming stylus to run the shade up and down using the adjustment buttons. Re-level if needed.
-
Set and verify limits.
ATP to Knowles Construction Ltd
-
Authorisation To Proceed to KCL.
Comments & Signatures
Any Comments
-
undefined
Summary
-
Operation and functionality was tested of the equipment installed by TwentyTwo Integration Ltd. To obtain further copies of this report or in the event of any queries concerning its contents or the installed system, please contact: TwentyTwo Integration Ltd The Printworks Unit D 22 Amelia Street London SE17 3BZ Tel: +44 (0) 203 484 7822 Email: info@twentytwointegration.com Web: www.twentytwointegration.com Please check the box to confirm acceptance of the survey carried out as described above.
TwentyTwo Integration Ltd - Signature
-
Add signature
Client/Representative - Signature
-
Add signature