Overview
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
-
Equipment Make, model and serial number
Testing
-
Cable spec - cable spec meets project design
-
Cable installation and management
-
Cable Termination - Cable and terminations comply with Project design and best practices
-
Cable labelling - Verify both ends ID meets project design
-
Cable continuity and ID test - cable continuity confirmed and cable label correct
-
LV cable insulation resistance test (DC) - comply with cable manufacturers or ANSI/NETA ATS-2009 table 100.1
-
MV cable Testing
-
Test of the oversheat/Jacketing - no breakdown of oversheat should occur during the test
-
Cable connection correctly performed and tight
Final assessment
-
Inspection
-
Re-Inspection
-
Acceptance
-
Reservations and notes
Signatures
-
Contractor
-
Client