Overview

  • Site conducted

  • Conducted on

  • Prepared by

  • Location
  • Equipment Make, model and serial number

Testing

  • Cable spec - cable spec meets project design

  • Cable installation and management

  • Cable Termination - Cable and terminations comply with Project design and best practices

  • Cable labelling - Verify both ends ID meets project design

  • Cable continuity and ID test - cable continuity confirmed and cable label correct

  • LV cable insulation resistance test (DC) - comply with cable manufacturers or ANSI/NETA ATS-2009 table 100.1

  • MV cable Testing

  • Test of the oversheat/Jacketing - no breakdown of oversheat should occur during the test

  • Cable connection correctly performed and tight

Final assessment

  • Inspection

  • Re-Inspection

  • Acceptance

  • Reservations and notes

Signatures

  • Contractor

  • Client

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.