Overview

  • Site conducted

  • Conducted on

  • Prepared by

  • Location
  • Testing equipment used Brand, model and serial number

Testing

  • PV Structure Earth connections visual checks (Cable and cable terminations comply with project design, and torque marked)

  • PV structure Earth connection - Continuity test

  • String inverter Earth connection - Visual checks (Cable and cable terminations comply with project design, and torque marked)

  • String inverter Earth connection - Continuity test

  • Perimeter fence Earth Connection - Visual check (Cable and cable terminations comply with project design, and torque marked)

  • Metallic Poles Earth Connection - Visual checks (Cable and cable terminations comply with project design, and torque marked)

  • Transformer Centre proactive connection Visual checks (Cable and cable terminations comply with project design, and torque marked)

  • Transformer centre Proactive Earth connection - Measurement <1 Ohm

  • undefined

Final assessment

  • Inspection

  • Re-Inspection required

  • Acceptance

  • Reservations and Notes

Signatures

  • Contractor signature

  • Client signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.