General Information
-
Client / Developer
-
Project reference name and Job Number
-
Date
-
Prepared by
-
Location
Substation Details
-
Substation Name
-
DNO / IDNO
-
LV network owner
Sub station Base
-
Is substation base correct to design
-
Is Base in correct location
-
Does base sit above finished ground level to prevent water ingress
-
Does substation base have GRP grating down and cut correctly
-
Is GRP grating support bar in place
-
Is base Level ( Photo with spirit Level )
-
Has all cable entry points into base been foam filled / capped to prevent gas entering the substation
-
Has Cable entry pit inside sub station been filled with sand
-
Has base bolt locating holes been filled with foam and grout
-
Has base joints been filled with foam and grey silicone
Substation Housing
-
GRP - Make and Model
-
Brick Built
-
Is all external signage in place
-
Are all external locks in place
-
Are all metal structures bonded and connected to earth
-
Has GRP anchor bolts been installed in all areas not just corners
-
Has GRP had silicone bead around to prevent water ingress
-
Installation/Mounting of RTU (complete ready for commissioning)
-
Has SMPL been installed
Earthing
-
Is it a hot or cold site
-
Installation of external earthing around S/S to design
-
Has all corners of substation had earth rods installed
-
Does HV Earth run out with the HV cable
-
Installation of internal earthing (as per design LV Cabinet, TX & HV RMU / RTU Earthed connected)
-
If Brick built are all door frames and vents bonded
-
Are all Earths labelled at earth bar
-
Earth test complete (results recorded / photos provided)
-
Are all HV earths connected
-
Is Earthing Combined or seperate
HV
-
Are HV terminations complete and how many HV cables enter TX
-
Sheath Test 5kV (please note and add photo)
-
Are all insulated boots installed
-
Are end terms Torqued to correct spec
-
Are Cable protection boxes bolted in place
-
Are all phases correct
-
TX tap setting
LV
-
LV terminations (confirm number installed)
-
Standard / Nonstandard rotation
-
Installation of LV SWA from LV cabinet into SL and RTU if required cut-out
-
LV dead tests complete (please note results in comments)
-
Voltages
-
LV protection settings entered
-
Live Testing ELI result in ohms
As Laids
-
Are As Laids complete - LV
-
Are As Laids complete - HV
General
-
Comments
-
Is Sub Station Compliant
-
Completed by
-
Signature
-
Company
-
Date