Information
-
Substation Name
-
Project Name
-
Project Manager
-
CPL
-
Conducted on
-
Location
-
Network Number
-
PM Number
-
Design Drawing Number
Scoping Sheet
Substation Works
-
Brief Job Description
-
Sequencing
Discipline
-
- Substations
- Underground
- Overhead
-
Scope Completion Date
-
Are Network Hours Accurate?
-
Estimated Hours
New Indoor Substation
-
New Substation
-
Site Induction
-
Builder Contact Details
-
Access Arangement
-
Details
-
Pictures
-
Crews to move in
-
Transport plant
- Franna
- Tray Truck
- Semi
- Small Crane
- Forklift
- Larger Crane 50/60T etc.
- Toy
-
Traffic Management Required?
-
Working Time for Move In
- Normal Working Hours
- Overtime
-
Days Required for Sub Build
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- More
-
Working Time for Sub Build
- Normal Working Hours
- Overtime
-
Additional Notes
New Kiosk
-
Kiosk Substation
-
Access Arangement
-
Details
-
Pictures
-
Transport plant
- Franna
- Tray Truck
- Semi
- Small Crane
- Forklift
- Larger Crane 50/60T etc.
- Toy
-
Traffic Management Required?
-
Installation Crew
-
Will Mains be Connected on Installation Day
-
Will Additional Standby be Required
-
Working Time
- Normal Working Hours
- Overtime
Augmentation Works
-
Augmentation
Project Works
-
Heavy Plant Transport Required
-
- Franna
- Tray Truck
- Semi
- Small Crane
- Forklift
- Larger Crane 50/60T etc.
- Toy
-
Traffic Management Required?
-
Access Arangement
-
Details
-
Pictures
-
Part 6 Required?
-
Add media
-
Days Required for Preperation
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- More
-
Working Time
- Normal Working Hours
- Overtime
-
Crews for Shutdown
-
Working Time
- Normal Working Hours
- Overtime
-
SRR Required
-
Permit Type
-
Hours for Shutdown
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- Other
-
Load Readings
Circuit
-
Circuit Type
- MCC Block & Stem
- MCC Modular
- JW4 with Bullhorn
- JW4 w/o Bullhorn
- Webber
- Jean Muller
- Northcote / Brunswick
- Nthc/Brun w/ Verity Stud
-
Name
-
Fuse Size
-
RED
-
WHITE
-
BLUE
-
Hoppers / BOB's Required
-
Circuits to be Hopped and BOB'd
Hopper
-
From Circuit...
-
To Circuit...
-
Is OH Crew Required for Outage? Tails/Bridges etc.
-
Can OH Work be done Alive?
-
Can Works be Completed Safely as per Design
-
Does Design need Revision
-
SRR Details
-
Do Materials need to be Ordered by Contractor
-
Plant Photos Etc.
Substation Condition Report
-
Transformer Conditions
Reading
-
Transformer No.
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- More
-
Manufacturer
- Wilson
- ASET
- ASEA
- TMC
- Shilin
- Other
-
Size
- 200kva
- 300kva
- 400kva
- 500kva
- 750kva
- 1000kva
- 1500kva
- 2000kva
-
RED
-
WHITE
-
BLUE
-
PCB Test Tag
-
Building Defects
-
Door Frame
-
Add media
-
Locks
-
Add media
-
Door
-
Add media
-
Door Handles
-
Add media
-
Door Closer
-
Add media
-
Fire Shutter Links
-
Add media
-
Fire Shutter Closed
-
Add media
-
Plinth Damage
-
Add media
-
Trench Covers
-
Add media
-
Water Damage
-
Add media
-
Cracks in Walls and Ceiling
-
Add media
-
Door Bund - Damaged or Non Existing
-
Add media
-
Signage
-
Citipower Signs
-
Add media
-
Substation Name Label
-
Add media
-
Circuit Destination Labels
-
Add media
-
Light and Power Faults
-
Bilge Pump
-
Add media
-
Ventilation Fan
-
Add media
-
Light Switch
-
Add media
-
Light Fittings/Globes
-
Add media
-
Socket Outlets
-
Add media
-
Environmental
-
RMU Oil - Green Tag
-
Add media
-
Additional Comments