Title Page
-
Site name
-
undefined
-
Project identification number
-
Date of site audit
-
Prepared by
-
Location
-
Project manager
-
Client
-
Principal contractor
-
Principal designer
-
Contractor
-
What version is the Construction phase health and safety plan?
-
Who is on site at time of the audit?
Site arrangements
-
What is the scope of work?
-
Is the latest version of The Construction phase health and safety plan available on site?
-
Has the plan been read and signed by all those working on site?
-
Is there a record of site induction for those persons on site?
-
Is the health and safety law poster displayed?
-
Is the public and employers liability insurance displayed?
-
Is there a fully stocked first aid kit available?
-
Is there one or more trained first aider?
-
Are the first aid certificates valid?
-
Is there access to toilets and washing facilities with hot and cold water?
-
Is the correctly branded PPE being worn by all personnel on site?
-
What is not being worn and by whom?
-
Is respiratory protective equipment is provided?
-
Are the users fit tested for the RPE issued to them?
Fire risk management
-
Has fire risk been considered for the project?
-
Where is the fire muster point for project personnel?
-
Have all personnel been provided with site specific information on fire safety?
-
Is there adequate fire fighting equipment available?
Work at height
-
Does the work involve work at height?
-
What access equipment is being used to work at height?
-
Are step ladders being used?
-
Have the step ladders got valid inspection certificates?
-
When we're the ladders last inspected?
-
Does the person using the ladder have suitable and valid training?
-
Is there a MEWP being used?
-
What type, make and model is it?
-
Have MEWP pre-use inspections been completed?
-
Does the operator have a valid IPAF training certificate for this MEWP?
-
Is an aluminium tower scaffold being used?
-
Is there a valid scaffolding inspection tag attached?
-
When was it inspected last?
-
Does the person who erected the scaffolding have a valid PASMA certificate?
-
Does the person erecting and dismantling the tower have a valid PASMA certificate?
Electrical
-
Who is the lead electrician on this site?
-
Has the lead electrician got the necessary competence and training?
-
Does the electrical work require safe isolation of circuits to prevent 'live' working?
-
If no, explain why not?
-
If yes, describe how this is achieved?
-
Have all electricians got circuit testers and proving units?
-
Have electricians got lock off kits?
-
Have lock off kits been used to isolate circuits?
-
Is a permit to work on electrical circuits required by the client?
Waste
-
Is waste arising from the project being disposed of by the Principal Contractor?
-
Are waste transfer notes being obtained and filed in the project folder?
-
What is being done to minimise waste?
Quality
-
Is there a quality management plan for the project?
-
Does the quantity management plan require calibrated test equipment?
-
Are the calibration certificates valid.
Environmental
-
Where plant is being used, is there a spill kit available for oil or fuel spill containment?
-
Have there been any spills on the project?
-
Has this been recorded and reported?
Training
-
Are training records available for all personnel working on the project?
-
Do operatives have the minimum training requirements to undertake the work?
-
What training is required or missing?
Housekeeping
-
Is the housekeeping on the project to a high standard?
IMS Record keeping.
-
Are the IMS record keeping requirements being followed?
-
Does the Project Manager require any support with the IMS?
-
Have there been any near-misses on the project?
-
Have they been recorded, reported, investigated and resolved?
-
Has there been any accidents on the project?
-
Have they been recorded, reported, investigated and resolved?
Additional information
-
Are there any additional comments or observations regarding this project?
Report acknowledgement
-
Project Manager signature.