Front Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Executive Summary
-
Executive Summary
Previous actions
-
Have all actions from previous audit been closed out?
-
Number of open actions?
Site Administration
-
Are Risk Assessments & Method Statements (RAMS) in place for all works reviewed as part of the audit?
-
Is the Construction Phase plan in place, up to date, available on site and briefed to the project management team?
-
Are all personal seen on site during the audit inducted and records held on M Site?
-
Is the F10 in place, in date and displayed on site?
-
Is the "H&S At Work" poster displayed on site?
-
Is the company H&S policy statement displayed and in date?
-
Is the Company Insurance document displayed and in date?
Site Arrangements
-
Is the site welfare sufficient?
-
Is there a trained site first aider?
-
Are the first aiders details displayed?
-
Is the first aid kit held on site and in date?
-
Is the first aid kit inspected weekly by the firstaider? Records must be uploaded to 4P.
-
Are the site security measures suitable, Hoarding, CCTV, anti climb measures Etc.
-
IS the site access and egress suitable? Firm level ground, segregation between people and plant.
-
Is the site signage in place and sufficient for the project?
-
Is the Traffic Management procedures in place?
-
Are Tool box talks conducted weekly and uploaded to 4P?
LOLER
-
Is LOLER equipment serviceable, safe and suitable for use?
-
Is the "Safe Working Load" (SWL) Clearly displayed on all LOLER equipment and accessories?
-
Are LOLER equipment and accessories store correctly?
-
Is there a register of LOLER equipment and accessories on site?
-
Is there a register of MEWPs on site?
-
Are persons using MEWPs on site trained and records held?
-
Does all LOLER equipment and accessories have in date Certificate Of Thorough Examination? (6 monthly for accessories & 12 months for equipment. 6 monthly for equipment which lifts people.)
-
Is there a nominated competent persons to conduct weekly inspections of LOLER Equipment and accessories?
-
Is there a record of Weekly Inspections?
-
Are the weekly inspections included as part of the "Friday Pack" and are they uploaded to 4P?
PUWER
-
Is all plant on site reviewed as part of the audit sufficient, suitable and safe for use?
-
Are guards in place where required?
-
Are emergency stop buttons in place and serviceable?
-
Does all plant have an in date 12 month service record?
-
is there a register of PUWER equipment on site?
-
Is all plant subject to a weekly inspection by a competent person?
-
Are inspection records included within the "Friday Pack" and records uploaded to 4P?
-
Is all electrical equipment serviceable and safe for use?
-
Is all electrical equipment subject to Portable Appliance Testing (PAT)?
-
Is there a register of PAT Equipment?
-
Is all PAT equipment subject to a weekly inspection?
-
Are the records of weekly inspections included on the Friday pack and uploaded to 4P?
Work at Height
-
Is there a suitable and approved "Safe System of Work" (RAMS) in place for all work at height opertaions?
-
Is suitable edge protection in place where required?
-
Are all personnal working at height trained and competent?
-
Has the hierarchy of elimination been followed for work at height? (Is there a safer option? Use of Harness & PPE should be a last resort.)
-
Are all tools tethered when working at height?
-
Is there a risk of materials or objects (Other than tools) falling from height?
-
Is a suitable exclusion zone in place?
-
Is a rescue plan in place?
-
Are rescue provision in place and readily/easily available?
-
Is the rescue kit sufficient for the task? Is the kit serviceable?
-
Is there a register of all work at height equipment?
-
Is all work at height equipment (Including Rescue kit) subject to a weekly check?
Fire Safety
-
Is the fire and emergency evacuation plan in place?
-
Are all penetrations in cavity's closed and sealed using fire rated materials?
-
Is there a fire risk assessment in place?
-
Is all hot works controlled on site? (e.g. no hot works on scaffolds, hot works permits in place?
-
Is Smoking on site controlled? Is there evidence of illicit smoking away from smoking area?
-
Has a fire evacuation drill been conducted within the last 3 months?
-
Is fire escape route signage in place and sufficient?
-
Are fire extinguishers in place?
-
Are fire extinguishers all in date of service?
-
Are fire extinguishers inspected weekly and recorded?
-
Is the fire alarm system in place and serviceable?
-
Are weekly tests carried out for the fire alarm?
-
Are all weekly inspections, checks and test records uploaded to 4P?
Lifting Operations (See LOLER section for equipment service records & documentation)
-
Are lift plans in place for lifting equipment? (Tower crane, spider crane, folk lift truck, telehandler, etc.)
-
Are lift assessments in place and briefed to lifting team?
-
Are members of the lifting team including lifting equipment operators and slingers all trained and competent? Records should be held on M Site.
-
Is there a weekly lifting team meeting? (Required on projects using tower cranes)
-
Is there a competent lift supervisor?
-
Is there a daily briefing for the lifting team conducted by the lift supervisor?
Personal Protective Equipment (PPE)
-
Are all personal wearing the correct PPE as per site rules? (Safety boots (S3 standard minimum), Glasses, gloves, hi vis vest, helmet)
-
Are all personal wearing the correct Helmet color for their role? (Black helmet for Supervisors)
-
Are personal wearing the correct task specific PPE? (Cut resistant gloves, Goggles, RPE)
-
Are personal wearing RPE Face fit tested where required?
-
Are records of FFT held on 4P?
-
If wearing tight seal RPE are the operatives clean shaven?
-
Are lifting team members and traffic marshals wearing orange PPE?
Occupational Health
-
Are personal at risk from noise exposure?
-
Are noise reduction methods in place?
-
Are noise barriers in place?
-
Are noisy working zone in place?
-
Is signage displayed warning others when entering a noisy work area?
-
is hearing protection provided for workers and personal in the area?
-
Are noise assessments in place?
-
Are personal at risk of vibration?
-
Is Vibration being monitored and recorded?
-
Is health surveillance being undertaken?
-
Is vibration equipment vibration ratings as low as is practicable?
-
Has vibration exposure been reduced to as low as practicable?
-
Are personnal exposed to Manual handling?
-
Are Manual Handling assessments in place?
-
Are personal trained in manual handling?
-
Is there sufficient measures in place to reduce manual handling exposure to as low as is reasonably practicable?
-
Is dust being produced as part of the works?
-
Have arrangements been made to avoid dust?
-
Is dust suppression in place and adequate?
-
Are dust extraction measures in place?
-
If required are dust monitoring measures in place?
-
Is PPE required and if so is it wore correctly and in line with manufactures guidance and UK regulations? (See PPE section for full details)
Environmental Procedures
-
Is the waste management and environmental plan in place and up to date?
-
Is CoSHH waste segregated on site?
-
Are hazardous waste transfer and consignment notes in place for waste from from site?
-
Do the waste removal company hold a hazardous waste removal licance?
-
Do the general waste removal company hold a valid in date licance?
-
Have Waste Transfer notes been completed for waste removed from site?
-
Has the waste been taken to a registered waste transfer facility?
-
Temporary works Procedures
-
Are TW permits being implemented correctly and followed where applicable?
-
Have all TW been subject to weekly inspections?
-
Is there a TW register on site?
-
Is the register up to date?
-
Date last checked
-
Is there a trained TWC on site and appointed by the Company Appointed Person?
-
Are all TW designs in place and at construction status?