EPDM site inspection form
-
Client: Wates
-
Job title: Wembley Park-EO1-EO2
-
Inspector: MPrice
-
Location
-
Block or phase
Requirements
-
Are all relevant drawings available on site
Inspection checklist:
-
Is the EPDM membrane fitted?
-
Has the EPDM membrane been overlapped correctly?
-
Have all joints been sealed correctly?
-
Were any alterations to the install? patch repairs?
-
Is EPDM free of bubbles?
-
Is the EPDM membrane free from damage?
Stub Brackets & Fins
-
Has the EPDM been installed?
-
has the correct overlap been installed?
-
is all the brackets covered and sealed?
-
have the correct product been applied? ( Obex paste adhesive) ?
-
have the correct lapping to the slab been applied?
Photos of Inspected EPDM
-
Photos of EPDM
Comments
-
Are there any comments?
Signatures
-
Checked on behalf of MPrice
-
Checked on behalf of Wates (deemed accepted if not returned by 1700 2 days after offered by MPrice)