Information
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
General information
-
Sales Manager -
- Alex Devlin
- Darren Barnes
- Mike Hughes
- Rachel Benton
- Paul Johnson
- Louise Adcock
- Richard Brown
- Dave Willis
- Dave Edwards
-
Project Number
-
Line Number
Printer Information
-
Printer Type
-
Printer Hand
-
PCU Serial Number
-
ACC Serial Number
-
Printer Serial Number
Installation
-
Installation Descrpition
-
Installation Photos
Print samples
-
Print Samples
Additional Application Parts
-
Were additional application parts required?
-
Project Parts & Suppliers
Services supplied by customer
-
1 x 240V 5A supply, at agreed position of printer
-
1 x 6 Bar air supply, supplied on 10mm OD for connection to M -Series. At agreed position of printer
-
1 x Ethernet port at agreed position of printer
-
1 x Fixed IP address prior to installation
-
Enter Network Details
Final Commisioning
-
Electricity - mains supply complies with local regulations
-
Trips and Falls - all cables and leads secured
-
COSHH - correct storage facilities and data sheets available
-
Lighting - sufficient in area of printer
-
Manual handling requirements acceptable
-
PPE identified and available for operators
-
Radiation Hazards - no exposure of laser or UV light
-
Ventilation - sufficient to maintain acceptable levels of fume / vapour / dust
-
Waste disposal - suitable method available to dispose of any inks / solvents / filters
-
Guarding - appropriate and sufficient to prevent accidental injury
-
Training - site personnel instructed on correct use of equipment
Installation sign off
-
I hereby accept that the installation has been completed as per the agreed standard and expectations outlined at point of order and throughout the installation process. The Domino supplied equipment is fully operational and instruction has been provided to allow full use
-
Customer Project Manager
-
Domino Engineer