Title Page
-
Machine Number
-
Date of Commissioning
-
Serial Number
-
Type
-
Magazine Size
- HSK 63 -54
- HSK 63 -80
- HSK 63 -160
- HSK 63 -240
- HSK 100 -50
- HSK 100 -100
- HSK 100 -150
-
Magazine Builder
- Neil Caulwell
- Harriet Chambers
- Lewis Durbin
- Chris Hitchcock
- Renan Oliveira
- Leigh Partl
- Jason Tuckey
- Travis Turner
- Anthony Vyse
- Daniel Waddison
-
Magazine Commissioner
Magazine Commissioner - Pre-Checks
-
Is the guide frame set correctly?
-
Are the guide frame rivnuts tightened?
-
Are the guide frame screws tightened?
-
Are the mountings correctly torqued?
-
Are DCV screws correct?
-
Are all the labels fitted correcly?
-
Is the magazine clean? (oil, grease, swarf etc)
-
Are all the screws tightened? (build)
-
Are all the lock washers installed correctly?
-
Is the lubrication routing correct?
-
Are the chain rail screws blue marked?
-
Are the lubrication fittings blue marked?
-
Are the hydraulic fittings blue marked?
-
Have all the holes been re-tapped?
-
Is the drive coupling set/tightened correctly?
-
Are all the sensor caps fitted?
-
Do all the shafts/ sprockets have wax applied ?
-
Is the tool loader functioning okay?
-
Are all the lubrication clips fitted?
-
Is the read write/head fitted?
-
Is the paint acceptable?
Magazine Commissioner- Final Checks
-
Is the chain rail aligned correctly?
-
Is the mounting free from damage?
-
Are the pockets free from rubbing? (check for debris on inside faces)
-
Is the additional parts box complete?
-
Is the pocket tightness acceptable?
-
Is the magazine free from lubrication leaks?
-
Is the magazine free from pneumatic leaks?
-
Are all the screws tightened? (commissioning)
-
Are the chain rails torqued correctly?
-
Are all the lubrication clips fitted?
PDI checks
-
Ges list print date
-
Is the Ges list checked and correct?
-
Is the handle for the tool loading station in the home position? (manual only)
-
Are the pop rivets removed from the finger trap covers?
-
Have all the chain rail inserts been 'blue marked'?
-
Have all the spring washers been fitted correctly?
-
Are all the Hydraulic, Pneumatic and Lubrication ports covered using plastic caps ?
-
Tool cleaning option- Is the 18mm steel pipe fitted? (HSK 100 only)
-
Tool cleaning option- Have the konig plugs been fitted to the distributor block?
-
Tool cleaning option- Have the 2 x NRV's fittings been installed into the manifold block?
-
Tool cleaning option- Is the cable routing correct (HSK63 or manual loaders)
-
Are the electrical plugs free from damage?
-
Are the mounting screws for DCV on HSK100 manual tool (02.016548) loader fitted correctly – screw heads and washers should be at the top?
-
Has the contents of the “additional parts box” been checked and transfered to a cardboard box. Cardboard box must be identified with M No or 75 number?
-
Have the screws and square washers been placed in the box for attaching the console? (H-series only)
-
Has the 01.001473 12mm Spherical washer is picked into the box? (H-series only)
-
Has the 01.000098 M12 x 120mm DIN912 is picked into the box? (Magazines with tool length 600mm) (H-series only)
-
Has the 01.000102 M12 x 160mm DIN912 is picked into the box? (Magazines with tool length 800mm) (H-series only)
-
Has the correct specification of the gearbox been fitted as per the GES-List?
-
Has the correct specification of the motor been fitted as per the GES-List?
-
Pneumatic Equipment - Have the foot pedal and pipelines been installed to the DCV and secured for transport?
-
Has all the residual oil, grease and swarf been cleaned/removed from the magazine?- (either fitter or commissioner to clean)
-
Have the protocols been filled out and signed? (In black ink only)
-
Has the Assembly been confirmed in SAP (CO11 & MB31)?
Completion form
-
Magazine now acceptable
-
Date