Title Page
-
Site Conducted
-
undefined
-
Conducted On
-
Prepared By
-
Location
Store Info
-
Store Name
-
Store Number
-
Site Safety Board On Display
-
Work Permit Completed ATL (General)
-
Electrical Permit Completed By Electrician (Electrical)
-
Person Signing On Permits
On Site Personnel
-
Total Number Of Engineers
-
Photo’s Of All Engineers CSCS
-
Photo’s Of All Engineers TESCO Cert
-
Site Board On Display
Install
-
Store Handed Back Fit To Trade
-
Please Explain
-
Job Completed As Per SOW
-
Please Explain
-
Have We Re Used Old Floor Trunking & Tri Lights
-
Please Explain
-
Have New Skirts Been Fitted To SSC
-
Please Explain
-
Have Front Doors Been Removed Off Old SSC For Recycling
-
Please Explain
-
Have All SSC Been Bolted Down
-
Please Explain
-
Have XR7 Heads Been Removed From Old SSC, Boxed Up & Returned To Holford
-
Please Explain
-
If SSC Being Removed Have 7879 Scales Have These Been Removed & Boxed Up To Return To Holford
-
Please Explain
-
Have End Of Trip Barcode Stickers Been Applied By NCR Engineer
-
Please Explain
-
Have Scanner Holders Been Transferred From Old To New Basket Shelves
-
Please Explain
-
Has Card Only/Card & Cash Signage Been Transferred From Old SSC To New SSC Or Left With Store
-
Any On Site Issues
-
Please Explain
-
Site Lead / Engineers Comments
-
Photo’s Of Installation
Sign Off Permits
-
Electrical Permit Signed Off
-
ATL General Permit Signed Off
-
Person Who Signed Off Permits
Engineers Sign Off
-
NCR Lead Engineer Sign
-
Electrician Companies Name
-
Electrician Lead Engineer Sign
-
ATL Lead Engineer
-
Main Contractor Sign
Job Sign Off To Be Signed By Store
-
Job Title
-
Signed