Title Page
-
Client
-
Store Number
-
Store Name
-
Conducted On
-
Prepared By
-
Location
-
Version 1.0 Initial Release ( ATL & NCR signoffs combined to make one 11/2/2023
-
Version 1.1 Updated for SM confirmation of installation against SOW 16/2/2023
-
Version 1.2 Signing in book capture added 5/6/2023
Pre Installation photos
-
Photograph of Installation area before Install
-
Wide angle photo of install area from face on
-
Wide angle photo of install area from RHS
-
Wide angle photo of install area from LHS
Store Info
-
Site Safety Board On Display
-
Store signing in book
-
Work Permit Completed ATL (General)
-
Electrical Permit Completed By Electrician (Electrical)
-
Person Signing On Permits
On Site Personnel
-
Total Number Of Engineers
-
Photo’s Of All Engineers CSCS
Install
-
Store Handed Back Fit To Trade
-
Please Explain
-
Job Completed As Per SOW
-
Please Explain
-
Any On Site Issues
-
Please Explain
-
Site Lead / Engineers Comments
Photos & Details of Installation
-
Signing Off of SCO or POS
Add Photos of Individual SCO
-
Click Add Photographs of individual SCO for each SCO installed
Add Photographs of individual SCO
-
Lane No
-
Photographs of RHS, Face On and LHS of SCO
-
Photgraphs of SCO Branding
Photographs of all SCO, Trunking, Service Poles and RAP
-
Wide angle Photographs of full row of SCO (From LHS & RHS)
-
Wide angle Photographs of full SCO pen (From 4 corners)
-
Photographs of trunking, service poles
-
Is there a Rap cabinet & Screen
-
Photograph of Rap cabinet
-
Photograph of Rap screen
SCO Installation
-
Are the SCO installed to plan
-
Give Details
-
Screenshot of annotated drawing
-
All SCO branding fitted correctly
-
Details of what is wrong
-
Photographs of Branding
-
All SCO's up and running with no I.T issues
-
Give Details & Lane No's
-
Photograph of Screen
Floor Trunking, Electrical trunking and Service Poles
-
All trunking fitted correctly, end caps secure, sockets fitted correctly and secure
-
Give details of discrepancies
-
Photographs of trunking
-
Are services poles fitted correctly and plumb
-
Give details of whats wrong
-
Photographs of service poles
Skirting
-
All Skirting fitted correctly
-
Give Details of discrepancies
-
Take photos
Mainbank and Manned Tills
-
Did we relocate any as part of our SOW
-
Has it been relocated correctly
-
Photograph required
-
Give Details
-
Photographic Evidence or Annotated Drawing
-
Has it been relocated correctly
-
Photograph required
-
Give Details
-
Photographic Evidence or Annotated Drawing
Flooring and Ceiling works
-
Have the flooring works been completed to a satisfactory standard
-
Give details
-
Take photos
-
Have the ceiling works been completed to satisfactory standard
-
Give details
-
Take photos
Add Photos of Individual POS
-
Click Add Photographs of individual POS for each POS installed
Add Photographs of individual POS with errors or issues
-
POS No
-
What area are you signing off?
- Mainbank
- Customer Services
- Kiosk
- Cafe
- Pharmacy
- Opticians
- George
- Electrical
-
Photograph of Mainbank Face On (From operator position)
-
Photgraph of POS Screen
-
Photograph of Re-positioned Checkout Controller
-
Photograph of Perspex Screen
-
Photo of Shroud & Scale Surround
-
Photo of Peripherals
-
Photograph of POS Face On (From operator position)
-
Photgraph of POS Screen
-
Photograph of Screen Stand with cashdrawer
-
Photograph of Peripherals
-
Is the POS operational
-
Give details of errors
Sign Off Permits
-
Electrical Permit Signed Off
-
ATL General Permit Signed Off
-
Person Who Signed Off Permits
Engineers Sign Off
-
NCR Lead Engineer Sign
-
Electrician Companies Name
-
Electrician Lead Engineer Sign
-
ATL Lead Engineer
-
Main Contractor Sign
Job Sign Off To Be Signed By Store
-
Job Title
-
Signed