Title Page
-
Store Number
-
Store Name
-
Client
-
Project Title
-
PM Name
- Andy Hindle
- Andy Richardson
- Benn Williams
- Mark Howard
- Paul Walker
- Sean Power
-
Store Manager
-
Telephone Number
-
Store Address
-
Store Opening Times
-
Email
SCO Formation
-
Which Layout is the PEN formation
-
What are the SCO numbers Left to Right
-
What are the SCO numbers Right to Left
-
What are the SCO numbers at Rap Screen and to the RHS
-
INSTRUCTIONS
_______________
1. Please answer all the questions below.
2. To add a Corrective Measure click on the Paperclip icon then ""Add Action"", provide a description, assign to a member, set priority, and due date
3. Complete audit by providing digital signature
4. Share your report by exporting as PDF, Word, Excel or Web Link.
Key Dates
-
Pre Start Meeting Date & Time
-
Main Installation Stage 1
-
Handover/Training Start Time/Day/Date
-
Go Live
Version Control and Change Log
-
Click "Add Item"
Item
-
Version
-
Brief Description of Changes
-
Date
Pre-Start Meeting Attendance
-
Click "Add Attendee"
Attendee
-
Store Management Team
-
Representative
-
Contact Details
Required Night 1
-
SCO Equipment : NCR
-
Install/Removal : ATL
-
Power & Data : ISG
-
CASE
1.0: Look outs that may obstruct install
-
Lighting, Sprinklers, Smoke Detectors, Air Con
-
Grilles, Columns, Bulkheads, CCTV, AOIF Cameras
-
Alarm System, Refrigeration, Walls or Partitions
-
Any other items found
-
Please specify.
1.01: SCO Equipment
-
No of Self Scan Checkouts to Upgrade
-
No of Card Only SCO Checkouts to Upgrade
-
No of SAYS SCO Checkouts to Upgrade
-
How many RAP's are on-site
-
Do the lane quantities correspond with the rollout schedule
-
Do the existing SCO have Welsh Branding
-
Are all the lanes operational (If not list lanes numbers that are not working)
-
If the lanes are in a coral formation as you walk into the coral what are the numbers of the 2 lanes in front of you
-
How many lanes are Taladega
-
How many lanes are Pocono
-
If the store is an Express and not Large Format and only NCR are required on-site is the store happy for a day installation. (The store will have to accept that they will lost all of the lanes for the day).
1.02: Ceilings/Bulkheads
-
Is there a ceiling above the proposed installed?
-
Height
-
Is there a bulkhead above the proposed install?
-
Height
-
Any other ceiling or bulkhead issues?
-
Please specify
1.03: Barrier Rails and Posts
-
Does the store have a Q Merch System that will obstruct the installation
-
• End post
-
• Mid post
-
Any other issues?
-
• Please specify.
1.04: CASE
-
Will CASE be required to disable panic alarms
-
Is there a fog bandit and where is it located
1.05: Access Equipment
-
Is Access Equipment required
-
Please specify.
-
Who to provide access equipment
-
Dropping off and storage of access equipment
-
Any other equipment issues?
-
Please specify.
2.0 : Delivery Arrangements
-
Specify any delivery restrictions in force
-
Agree delivery vehicle parking and offloading location
-
Delivery into store access point
-
Acceptance and Storage arrangements of any contractors equipment delivered prior to start date
3.0 : Store Issues
-
Store to remove merchandise and POS from any modules or checkouts being resited or removed
-
Nominated store representative for communications during installation
-
Allow contractors access to welfare facilities i.e. staff canteen and toilets. Meal/Snacks arrangements
-
Agree location for contractor signing in and out register
4.0 : Further Observations / Comments / Requirements etc
-
-
4.01
-
4.02
-
4.03
-
4.04
-
4.05
-
Additional Photographs to support survey
Completion
-
Completed By : (Name & Signature)