Information
Weekly check colt anderlecht
-
Performed in week:
-
Conducted on
-
Prepared by
Airco
-
Airco1
-
Airco 2
-
Airco 3
-
Airco 4
-
Airco 5
-
Airco 6
-
Airco 7
-
Airco 8
-
Airco 9<br>
-
Airco 10
-
Fancoil 1
-
Fancoil 2
-
Fancoil 3
-
Fancoil 4
-
Fancoil 5
-
Fancoil 6
-
Fancoil 7
-
Fancoil 8
-
Fancoil 9
-
Fancoil 10
-
Airco securityroom
-
Chiller 1
-
Chiller 2
48V Dc A
-
Visual check modules
-
Check battery
-
Check voltage/load
48V Dc B
-
Visual check modules
-
Check battery
-
Check voltage/load
UPS
-
Check battery
-
Ups load 1A
-
Ups load 1B
-
Ups load 1C
-
Ups load 2A
-
Ups load 2B
-
Ups load 2C
Generator
-
Check emergency stop not pressed
-
Check level coolingwater
-
Check air intake
-
Pre heating
-
Check battery
-
Check for lose parts
-
Fuel level outside tank
-
Fuel level inside tank
-
Indication lamps /sensing instruments
-
Numer of starts
Electrical equipment
-
Check distribution boards en static switches
-
HVAC room
-
Node
-
Colo 1
-
Colo 2
-
Colo 3
-
Power room1
-
Power room2
-
Power room 3
-
Power room 4
-
Battery room 1
-
Battery room 2
-
HV room building
-
Generatorroom
-
Visual check sockets
-
Visual check switches
Water leak detection
-
Check if no errors
-
Visual check cabling
FDS
-
Check gas bottles
-
Check gasrelease panels
-
Check vesda panels
-
check battery main fds panel
Lighting
-
Emergency lighting
-
HVAC room
-
Node
-
Colo1
-
Colo2
-
Colo3
-
Generatorroom
-
Power room1
-
Power room2
-
Power room 3
-
Power room 4
-
Battery room 1
-
Battery room 2
-
Lighting
-
HVAC room
-
Node
-
Colo1
-
Colo2
-
Colo3
-
Generatorroom
-
Power room1
-
Power room2
-
Power room 3
-
Power room 4
-
Battery room 1
-
Battery room 2
General
-
Check locks monthly
-
First aid box
-
Check if site is free of trash
Sign Off
-
On site representative