Information

Weekly check Evere

  • Performed in week:

  • Conducted on

  • Prepared by:

UPS

  • UPS A powerroom 1

  • Load measurements (KVA):

  • UPS B powerroom 2

  • Load measurements (KVA):

  • Batteries free from cracks and dirt?

  • Picture of problem

  • Comments

Airco

  • Airco 1 powerroom 1

  • Airco 2 powerroom 2

  • Airco 3 node

  • Airco 4 node

  • Airco 5 node

  • Airco 6 node

  • Airco 7 node

  • Airco 8 node

  • Airco 9 housing

  • Airco 10 node

  • Airco 11 node

  • Picture of problem

  • Comments

DC 48V

  • Rectifier A powerroom 1

  • Load measurements (VA):

  • Rectifier B powerroom 2

  • Load measurements (VA):

  • Batteries free from cracks and dirt?

  • Picture of problem

  • Comments

Generator

  • Generator 1

  • Check level coolingwater

  • Check emergency stop not pressed

  • Check air intake

  • Pre heating

  • Battery measurements:

  • Check for lose parts

  • Fuel level above 75%

  • Indication lamps /sensing instruments

  • Generator 2

  • Check level coolingwater

  • Check emergency stop not pressed

  • Check air intake

  • Pre heating

  • Battery measurements:

  • Check for lose parts

  • Fuel level above 75%

  • Indication lamps /sensing instruments

  • Picture of problem

  • Comments

Electrical equipment

  • Visual check of pdu/cabling/sockets?

  • PFC corrector bank checked?

  • Picture of problem

  • Comments

Water leak detection

  • Checked the status of the waterleakdetection at the security room?

  • Picture of problem

  • Comments

FDS

  • Pressure of the extinguishing bottles checked?

  • Main fire central at the security room checked?

  • Extinghuishing panels in auto mode?

  • Picture of problem

  • Comments

Roof

  • Lightning protection checked?

  • Air condensors checked?

  • Drain pipes free from dirt?

  • Picture of problem

  • Comments

Air handling

  • Checked the small ventilation units?

  • Checked the air handling unit of the office?

  • Checked the air handling unit of the node?

  • Airco security checked?

  • Airco office checked?

  • Picture of problem

  • Comments

Heating

  • Gasboiler checked?

  • Heating checked?

  • Picture of problem

  • Comments

Lighting

  • Lighting checked?

  • Picture of problem

  • Comments

  • Emergency lighting checked?

Emergency lighting

  • Picture of problem

  • Comments

Security system

  • Acces system checked?

  • Intrusion system checked?

  • Building management system checked?

  • Picture of problem

  • Comments

High voltage room

  • Checked the high voltage room?

  • Checked the air extractor of the high voltage room?

  • Picture of problem

  • Comments

General

  • Check locks monthly

  • Boiler hot water test +60°C

  • First aid box

  • Check if site is free of trash

  • Picture of problem

  • Comments

Sign Off

  • On site representative

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.