Information
Monthly checklist oostende
-
Conducted on
-
Prepared by
Airco
-
Airco1
-
Airco 2
-
Airco 3
-
Comments:
48V Dc A
-
Visual check modules
-
Check battery
-
Comments:
48V Dc B
-
Visual check modules
-
Check battery
-
Comments:
Electrical equipment
-
Check distribution boards
-
Visual check sockets
-
Visual check switches
-
Comments:
Monthly power measurement
-
Rectifier
-
Batterie voltage:
-
I load:
-
DCA load:
-
DCB load:
-
Powermeter outside distribution board
-
Kwh:
-
Kva:
-
KW:
-
Power factor:
-
V/A:
-
Comments:
Water leak detection
-
Container
-
Comments:
FDS
-
Check gas bottles
-
Check Fds panel
-
check battery
-
Comments:
Roof
-
Check lightning protection
-
Check outdoor unit airco 3
-
Comments:
Lighting
-
lighting
-
Emergency lighting
-
Comments:
General
-
Check locks monthly
-
First aid box
-
Check if site is free of trash
-
Picture of problem(s):
-
Comments:
Sign Off
-
On site representative