Information

Weekly check anderlecht

  • Conducted on

  • Week:

  • Prepared by

Airco

  • Room cool unit 1

  • Fancoil unit 1

  • Room cool unit 2

  • Fancoil unit 2

  • Room cool unit 3

  • Fancoil unit 3

  • Room cool unit 4

  • Fancoil unit 4

  • Room cool unit 5

  • Fancoil unit 5

  • Room cool unit 6

  • Fancoil unit 6

  • Room cool unit 7

  • Fancoil unit 7

  • Room cool unit 8

  • Fancoil unit 8

  • Room cool unit 9

  • Fancoil unit 9

  • Room cool unit 10

  • Fancoil unit 10

  • Fresh air unit building

  • Extractor unit building

  • Extractor unit high voltage room

  • Vrv airco system technical rooms

  • Airco Office

  • Chiller 1

  • Chiller 2

  • Pumps chillers

  • Automatic filling station

  • Comments:

  • Picture

48V Dc A

  • Visual check modules

  • Check batteries

  • Load: Voltage:

  • Comments:

  • Picture

48V Dc B

  • Visual check modules

  • Check batteries

  • Load: Voltage:

  • Comments:

  • Picture

Power corrector banks

  • Pfc bank 1 checked

  • Pfc bank 2 checked

  • Pfc bank 3 checked

  • Comments:

  • Picture

UPS

  • Check batteries

  • Comments:

  • Picture

  • Ups load A1

  • Ups load A2

  • Ups load B1

  • Ups load B2

  • Ups load C1

  • Ups load C2

Generator

  • Check emergency stop not pressed

  • Check level coolingwater

  • Check air intake

  • Pre heating

  • Check battery

  • Check for lose parts

  • Fuel level above 75%

  • Indication lamps /sensing instruments

  • Number of starts:

  • Comments:

  • Picture

Electrical equipment

  • Check distribution boards

  • HVAC room 1

  • HVAC room 2

  • Node

  • Colo 1

  • Colo 2

  • Colo 3

  • Power room1

  • Power room2

  • Power room 3

  • Power room 4

  • Battery room 1

  • Battery room 2

  • HIgh voltage room building

  • Visual check sockets

  • Visual check switches

  • Picture

  • Comments:

Water leak detection

  • Check main waterleakdetection panel

  • Visual check cabling

  • Picture

  • Comments:

FDS

  • Check gas bottles

  • Check extinguishing panels

  • Check vesda systems

  • Picture

  • Comments:

Lighting

  • Emergency lighting

  • HVAC room 1

  • HVAC room 2

  • Colo 1

  • Colo 2

  • Colo 3

  • Node

  • Power room1

  • Power room2

  • Power room 3

  • Power room 4

  • Battery room 1

  • Battery room 2

  • Lighting

  • HVAC room

  • Node

  • Colo 1

  • Colo 2

  • Colo 3

  • Power room1

  • Power room2

  • Power room 3

  • Power room 4

  • Battery room 1

  • Battery room 2

  • Picture

  • Comments:

General

  • Check locks monthly

  • First aid box

  • Check if site is free of trash

Sign Off

  • On site representative

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.