Title Page

  • Conduced on

  • Location

  • TECHNICIANS INFORMATION (FAC)

  • International Occupational Safety and Health Administration (OSHA)
    International Publications
    - National Electrical Code® (NEC®)
    - National Electrical Safety Code® (NESC®)
    - National Fire Protection Association (NFPA 70E)

  • Attach photo of Equipment

  • In House or Contractor?

  • Contractor

Medium Voltage Substation

Exterior and Interior

  • General cleaning (before)

  • General cleaning (after)

  • Cleaning of insulators and insulators.

  • Cell painting (Exterior)

Bar connections adjustment.

Arrival switch disconnector lubrication and calibration.

Conductance measurement

Insulation resistance

  • Measurement of the contact resistance of the power disconnector.

Dielectric strength of the insulation

Thermographic Inspection

Transformation relation

Winding resistance

Contact resistance

Measurement of grounding resistance

Transformer

Exterior and Interior

  • General cleaning (before)

  • General cleaning (after)

  • Cleaning of insulators and insulators.

  • Cell painting (Exterior)

Oil analysis

  • Sampling

Bar connections adjustment.

Ground Connection.

  • System measurement (Well grounded).

  • FAC Tech
  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.