Title Page

  • Conducted on

  • Prepared by

Maintenance Schedule - Daily Checks (10 hours)

General Machine

  • Guards - Check / Replace

  • Emergency Stops - Check Operation

  • Pins - Check / Replace

Belt Feeder

  • Belt feeder

  • Belt Tension - Check/tighten (Refer to conveyor belt info page)

  • Belt - Check for obstructions/remove

  • Alignment - Check/align (Refer to conveyor belt info page)

Trommel

  • Drum - Check for obstructions/remove

  • Drive wheels - Check/adjust contact with drum

  • Guide wheels - Check/adjust contact with drum

Fan

  • Impeller - Check for obstruction / remove

  • Belt - Check for obstructions/remove

Magnet

  • Belt - Check for obstructions/remove

Conveyors

  • Tension - Check / Tighten

  • Alignment - Check / Align

  • Belt - Check for obstruction / remove

Scalping Screen

  • Screen bed - Check for obstructions / remove

  • Screen Mesh (wear) - Check / Replace

  • Bolts / Tines - Check Tighten

  • Springs - Check / Replace

  • Rubber Cushions - Check / Replace

  • Parameters (800-900rpm, 8mm Throw) - Check / set

ASU

  • Drum - Check for obstructions / remove

Interlocks / Isolators

  • Interlocks on gate(s) checked - Ensure plant / equipment is de-energised

Sign off

  • Name of Inspector

  • Signature

  • Date

  • Hours

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.