Information
-
Project Name
-
Project Number
-
Principal Contractor
-
Conducted on
-
Prepared by
-
Location
-
Site Supervisor
-
1. SSMP on site
-
2. SWMS are provided for all high risk construction activities that are being undertaken on site and are reviewed and signed by those undertaking the work.
-
3. Construction Project Hazard log on site and updated regularly
-
4. Emergency procedures, Drug and alcohol policy and site safety rules displayed on site
-
5. All staff have been inducted onto the site
-
6. Pre-work brief has been undertaken by the site supervisors
-
7. Pedestrian access around site is clean and well managed, boundary gates closed or manned, Temporary fencing is secure and appropriate traffic management is in place.
-
8. All site people wear appropriate PPE for the work undertaken as required in the SWMS
-
9. Adequate fire extinguisher(s) on site and in date and accessible.
-
10. A qualified first aider is available on site and list of First Aiders is displayed on site
-
11. Work areas clean and tidy, clear trip and slip hazards and exits clear from obstruction. Storage areas secured, including dangerous goods storage and hazardous equipment
-
12. Worksite protection on site is as per worksite protection plan
-
13. Traffic control for the site / road interface is in place
-
14. Worksite Traffic Management Plan for vehicles and plant on site is in place
-
15. All portable electrical tools in good condition and tested monthly and lead stands / hooks are in use.
-
16. Electrical permit obtained if SADs cannot be maintained or appropriate controls in place with a L4 approved SWMS in place.
-
17. Plant risk assessments available and controls in place with daily pre-start checks have been completed for all plant.
-
18. Exclusion zones are in place around mobile plant and people and plant is managed.
-
19. Mechanical manual handling equipment is available
-
20. Hot work permit completed and work and requirements complies with permit and appropriate fire fighting equipment available
-
21. Working at heights plan reviewed and approved with appropriate controls in place including fall arrest or fall prevention. All staff working at height are qualified.
-
22. Excavation plan is on site, has been approved and is being followed
-
23. Results from service searches are on site and services are marked on site and identified.
-
24. Penetrations and excavations are sign posted and guarded
-
25. Excavations are benched / battered / shored and edges of excavations have fall prevention measures in place
-
26. Scaffolding is certified and regularly inspected and not installed within electrical SAD’s.
-
27. Demolition plans are in place and demolition supervisor is qualified
-
28. Formwork is installed correctly and inspected and certified
-
29. A hazardous materials register is available and appropriately stored on site.
-
30. Asbestos / Lead removal plans on site and workers qualified with licences on site and work completed to SWMS.
-
31. Signed off SEMP and SECM on site, and controls in place as per SEMP and SECM
-
Work is progress during inspection:
-
Comments and potential improvements:
-
Signed: