Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
-
Project Reference
-
Site Supervisor
Audit Checklist
Site Office Space/Housekeeping/Staff
-
Is NACW Site office space organised and professionally presented?
-
Is office paperwork tidy?
-
Is a Safety Notice Board or communication area available for workers
-
Are displayed documents current and up to date?
-
Is the NACWL Employers Liability certificate displayed and valid?
-
Are the company policies, HSE information and insurances being communicated in other ways?
-
How?
-
Is the HSE Poster being displayed with relevant information?
-
Are staff professionally presented with NACWL PPE?
Site Files & Records
-
Is there suitable IT provision on site? ie Wifi/access to server/laptop/printer/scanning facility
-
Is Supervisor able to confidently use IT systems at Site (Client/NACW software)?
-
What training is needed?
-
Does the Site Supervisor have access to Project files?
-
Are they using both electronic & paper documents? ie Site Files & documents on server
-
Is this site actively using BREATHE HR
-
Is there a training requirement ie do they know how to use it?
-
Why are they not using it?
-
Have H&S folders been set up correctly
-
What action is needed?
-
Are daily diaries being sufficiently completed? check sample from previous month
-
Are copies of daily diaries being uploaded to Project file on Server?
-
Are Progress reports being completed fortnightly?
-
Are progress reports being saved in the project file on the server?
-
Is a Friday Pack being completed?
-
Is the Friday Pack being saved on the server?
-
Any evidence of 'personal data' being stored insecurely (ie induction sheets etc)
-
Is there anywhere provided to store this securely?
-
How is personal information being managed
Design Records & Drawings
-
Does the Project Manager/Site Supervisor have access to relevant design info for project?
-
Do they have access to up-to-date drawings
-
How do they receive updates/Change notifications?
Worker Management & Training
-
Are RAMS available for work being undertaken?
-
Has the latest revision of the RAMS template been used?
-
Have all operatives signed to confirm that they have reviewed and understood the RAMS?
-
Do the RAMS contain the latest Environmental Risk Assessment?
-
Date completed/reviewed?
-
Skills records - NACW Workers - check sample of different people's records when answering these questions
-
Have necessary inductions been carried out on site - check sample of records for workers on site today
-
Site rules understood?
-
Client Induction completed?
-
NACW's site induction completed?
-
Have Right to Work Checks been completed for all operatives?
-
Are copies of NACW Workers CSCS cards available? check sample
-
Are relevant competency tickets available for operatives working? check sample for those on site during audit.
-
Are there records of any recent Working at Height, Manual Handling or Traffic Marshall training?
-
NACW First aider on site?
-
Identify date for retraining (Qualification Expiry)
-
Is there a Fire Marshall on site?
-
Is the Fire Marshall an NACWL representative?
-
When were they trained?
-
Are Toolbox Talks being regularly carried out?
-
Record topic of last Toolbox Talk
-
Record date of last Toolbox Talk
-
Have all staff (management and operatives) signed the daily sheet?
-
Are signed records of attendance available?
-
-
Is there an Accident Book?
-
Are the First Aid Box contents checked regularly?
-
Have there been any accidents on site?
-
Have these accidents been reported in line with PR10 H&S Accident Reporting?
-
Has an accident investigation report been carried out?
-
Have any actions raised from the investigation report been completed?
Sub-Contractors
-
Are there any 'priced' sub-contractors working on this project
-
Are RAMS available for the work they are undertaking?
-
Has Subcontractor produced their own RAMS
-
Have operatives signed to confirm that they have reviewed and understood the RAMS?
-
Are operatives signed in on daily sign in?
-
Are Subcontractors insurances regularly check and still valid?
-
Is there adequate Supervision on site?
-
Are copies of Subcontractors Supervisor cards available?
Equipment & Plant Records
-
Is there a list of equipment on site?
-
Is Plant & Equipment Inspection register up-to-date?
-
Does any equipment used on this project require calibration
-
Record date of last calibration and add photo of cert
-
Is the PPE register available, complete and up-to-date
-
Is the PAT register availalble and up to date?
FAVRO system
-
Are site actively using the FAVRO cards?
-
Have there been any delivery/quality issues on this project to date?
-
Has this been managed on FAVRO card(s)?
-
Have cards been moved to 'Delivered' or 'Archived' as required?
Environmental
-
Is COSHH Register up to date with relevant COSHH assessments signed by operatives?
-
Are NACW responsible for removing any waste from this job?
-
Check that duty of care paperwork is available
-
Are there any site specific Env Issues or controls for this project?
-
Can it be demonstrated that these are being adhered to/controlled?
Non-Conformance/Business Improvement
-
Have there been any customer or project issues raised as non-conformities for this site (delay, damage by another contractor etc )
-
Has this been recorded on BIP Log
-
Have all issues been resolved in a timely manner?
-
Is BIP site register available and up to date
undefined
End of audit review
-
Any action(s) to be taken have been agreed with Site Supervisor
-
Arrange a follow up discussion with Project Director
-
Site Supervisor signature