Title Page
-
Site Name
-
Site BUN Number
-
Site Address
-
Conducted on
-
Prepared by
Projector Location
-
Is there a existing Projector
-
Location of Projector
-
Access to Projector
-
Make of existing Projector
-
Model of existing projector
-
Existing connection into Projector
-
Power location for Projector
-
Picture of existing Projector
-
Is there an existing Screen
-
Location of Screen
-
Size of screen Height/ Width
-
Is the screen Electric or manual pull down
-
Picture of Screen
-
Is a new Projector Location required
-
Projector location
-
Picture of Projector Location
-
Access to Projector
-
Is there power for Projector
-
Picture of Power
-
Is a new mains socket required for the Projector
-
Location of the required mains socket
-
Picture of the location of required mains socket
-
Screen Location
-
Picture of Screen Location
-
Screen Dimension Height/ Width in cm
Distribution to Projector
-
Is there currently a HDMI output receiver onsite
-
Is the HDMI port in use
-
Is there a HDMI splitter/ Matrix onsite with a spare output
-
What is required to supply a spare HDMI port to the Projector
-
What is required to supply a spare HDMI port to the Projector
-
Is the HDMI port within 20m of the Projector
-
What is required to connect the HDMI port to the Projector
General
-
Was full access available to complete survey?
-
Please give details
-
Are specific parking arrangements required?
-
Please give details
-
Is there easy access for equipment and blocks?
-
Provide details
-
Are there any special equipment/materials required?
-
Please give details
-
Estimate the number of hours/days needed to complete the installation
- 1 hour
- 2 hours
- 3 hours
- 4 hours
- 5 hours
- 6 hours
- 7 hours
- 8 hours
- ½ day
- 1 day
- 1½ days
- 2 days
- 2½ days
- 3 days
- 3½ days
- 4 days
- 4½ days
- 5 days
-
State if one, two or three man installation
-
Indicate when the installation services can be performed
- In normal office hours
- Out of hours - evenings
- Out of hours - Saturdays
- Out of hours - Sundays
-
Any additional comments?
Additional Photographs
-
Any additional photos
Sign Off
Client
-
I confirm the dish/aerial/receiver location(s), internal works, cable entry route(s) and point(s) of entry are agreed
-
Client/Site Contact Name
-
Client/Site Contact Position
-
Client/Site Contact Signature
Engineer
-
Engineer Name
-
Engineer signature