Information
-
Audit Number
-
Part Number
-
Part Description
-
Auditor
-
Date and Time Of Audit
-
Shift
-
Manufacturing Order Number
-
MTM Name:
-
Team Leader Name:
-
Supervisor Name:
Metal Preparation
-
1.1 Operations Performed as per Route Card / Technical Instructions?
-
Comments:
-
Recommended Action:
-
By when?
-
Responsible Person:
-
1.2 Quality Standard / Workmanship Acceptable?
-
Comments:
-
Recommended Action:
-
By when?
-
Responsible Person:
-
1.3 Quality Records Complete As Per Requirements?
-
Comments:
-
Recommended Action:
-
By when?
-
Responsible Person:
Moulding
-
2.1 Operations Preformed As Per Rout Card / Technical Instructions?
-
Comments:
-
Recommended Action:
-
By when?
-
Responsible Person:
-
2.2 Quality Standard / Workmanship Acceptable?
-
Comments:
-
Recommended Action:
-
By when?
-
Responsible Person:
-
2.3 Quality Records Complete As Per Requirements?
-
Comments:
-
Recommended Action:
-
By when?
-
Responsible Person:
Secondary Operations
-
3.1 Operations Preformed As Per Rout Card / Technical Instructions?
-
Comments:
-
Recommended Action:
-
By when?
-
Responsible Person:
-
3.2 Quality Standard / Workmanship Acceptable?
-
Comments:
-
Recommended Action:
-
By when?
-
Responsible Person:
-
3.3 Quality Records Complete As Per Requirements?
-
Comments:
-
Recommended Action:
-
By when?
-
Responsible Person:
Testing
-
4.1 Operations Preformed As Per Rout Card / Technical Instructions?
-
Comments:
-
Recommended Action:
-
By when?
-
Responsible Person:
-
4.2 Quality Standard / Workmanship Acceptable?
-
Comments:
-
Recommended Action:
-
By when?
-
Responsible Person:
-
4.3 Quality Records Complete As Per Requirements?
-
Comments:
-
Recommended Action:
-
By when?
-
Responsible Person:
Assembly
-
5.1 Operations Preformed As Per Rout Card / Technical Instructions?
-
Comments:
-
Recommended Action:
-
By when?
-
Responsible Person:
-
5.2 Quality Standard / Workmanship Acceptable?
-
Comments:
-
Recommended Action:
-
By when?
-
Responsible Person:
-
5.3 Quality Records Complete As Per Requirements?
-
Comments:
-
Recommended Action:
-
By when?
-
Responsible Person:
Painting
-
6.1 Operations Preformed As Per Rout Card / Technical Instructions?
-
Comments:
-
Recommended Action:
-
By when?
-
Responsible Person:
-
6.2 Quality Standard / Workmanship Acceptable?
-
Comments:
-
Recommended Action:
-
By when?
-
Responsible Person:
-
6.3 Quality Records Complete As Per Requirements?
-
Comments:
-
Recommended Action:
-
By when?
-
Responsible Person:
Final Inspection
-
7.1 Operations Preformed As Per Rout Card / Technical Instructions?
-
Comments:
-
Recommended Action:
-
By when?
-
Responsible Person:
-
7.2 Quality Standard / Workmanship Acceptable?
-
Comments:
-
Recommended Action:
-
By when?
-
Responsible Person:
-
7.3 Quality Records Complete As Per Requirements?
-
Comments:
-
Recommended Action:
-
By when?
-
Responsible Person:
Shipping
-
8.1 Operations Preformed As Per Rout Card / Technical Instructions?
-
Comments:
-
Recommended Action:
-
By when?
-
Responsible Person:
-
8.2 Quality Standard / Workmanship Acceptable?
-
Comments:
-
Recommended Action:
-
By when?
-
Responsible Person:
-
8.3 Quality Records Complete As Per Requirements?
-
Comments:
-
Recommended Action:
-
By when?
-
Responsible Person:
Audit Sign-off
-
Auditor
-
Auditee
Notes
Definitions
-
AUDIT - Systematic, independent and documented process for obtaining evidence and evaluating it objectively to determine how well the audit criteria are fulfilled.
-
AUDITOR - Person who has undertaken a recognised Auditor's course either conducted internally or by a recognised External body, or person who possesses sufficient business experience and knowledge of AS/NZS ISO 9001, 14001 and/or 4801 to conduct an audit.
-
RECOMMENDED ACTION - Action to eliminate the cause of a detected non-conformity or other undesirable situation. In context of this audit, the meaning is to include action taken to rectify an identified deficiency (non-conformance or improvement opportunity), or action to prevent recurrence of a previous deficiency.
-
IMPROVEMENT OPPORTUNITY - Observations made which are provided as guidance on potential system improvement.
-
NON-CONFORMANCE - Non-fulfilment of a requirement. In the context of this audit checklist, the word "non-conformance" is used to describe conditions outside previously agreed, defined or specified requirements (including statutory requirements). It is a deficiency in documentation or procedures that reduces the quality of a material or service or introduces unacceptable risks to safety or the environment.
-
NOT APPLICABLE (N/A) - In some circumstances, the question may not be applicable to the works being audited. In this instance, N/A can be recorded against the criteria and the question and points available removed from the audit scoring process.
-
MAJOR NON-CONFORMANCE - In auditing terminology a major non-conformance indicates the absence of a system or part of the system, or that the documented systems or procedures are not being followed. A major non-conformance can be where there is an obvious and potentially threatening system discrepancy likely to expose people, the environment, or the company to high or extreme risk. Non-conformances identified as the primary cause of a significant incident, or a warranted customer complaint, are considered major. A major non-conformance may require immediate rectification if there is a threat to the environment, equipment or the safety of people.
-
PREVENTATIVE ACTION - Action taken to prevent possible occurrence of potential deficiency / adverse impact to the quality, safety and environment.
-
SYSTEM - Consists of the following elements; policy, procedures, safe work procedures, safe work instructions, environmental instructions, forms, checklists, templates, plans and tools.
-
KEY:
C = Conformance
IO = Improvement Opportunity
N/C = Non-conformance
Mn N/C = Minor Non-conformance
Mj N/C = Major Non-conformance -
SCORING SYSTEM:
Conformance (C) = 3 points
Improvement Opportunity (IO) = 2 points
Minor Non-conformance (Mn N/C) = 1 point
Major Non-conformance (Mj N/C) = 0 points