Information

  • Audit Number

  • Part Number

  • Part Description

  • Auditor

  • Date and Time Of Audit

  • Shift

  • Manufacturing Order Number

  • MTM Name:

  • Team Leader Name:

  • Supervisor Name:

Metal Preparation

  • 1.1 Operations Performed as per Route Card / Technical Instructions?

  • Comments:

  • Recommended Action:

  • By when?

  • Responsible Person:

  • 1.2 Quality Standard / Workmanship Acceptable?

  • Comments:

  • Recommended Action:

  • By when?

  • Responsible Person:

  • 1.3 Quality Records Complete As Per Requirements?

  • Comments:

  • Recommended Action:

  • By when?

  • Responsible Person:

Moulding

  • 2.1 Operations Preformed As Per Rout Card / Technical Instructions?

  • Comments:

  • Recommended Action:

  • By when?

  • Responsible Person:

  • 2.2 Quality Standard / Workmanship Acceptable?

  • Comments:

  • Recommended Action:

  • By when?

  • Responsible Person:

  • 2.3 Quality Records Complete As Per Requirements?

  • Comments:

  • Recommended Action:

  • By when?

  • Responsible Person:

Secondary Operations

  • 3.1 Operations Preformed As Per Rout Card / Technical Instructions?

  • Comments:

  • Recommended Action:

  • By when?

  • Responsible Person:

  • 3.2 Quality Standard / Workmanship Acceptable?

  • Comments:

  • Recommended Action:

  • By when?

  • Responsible Person:

  • 3.3 Quality Records Complete As Per Requirements?

  • Comments:

  • Recommended Action:

  • By when?

  • Responsible Person:

Testing

  • 4.1 Operations Preformed As Per Rout Card / Technical Instructions?

  • Comments:

  • Recommended Action:

  • By when?

  • Responsible Person:

  • 4.2 Quality Standard / Workmanship Acceptable?

  • Comments:

  • Recommended Action:

  • By when?

  • Responsible Person:

  • 4.3 Quality Records Complete As Per Requirements?

  • Comments:

  • Recommended Action:

  • By when?

  • Responsible Person:

Assembly

  • 5.1 Operations Preformed As Per Rout Card / Technical Instructions?

  • Comments:

  • Recommended Action:

  • By when?

  • Responsible Person:

  • 5.2 Quality Standard / Workmanship Acceptable?

  • Comments:

  • Recommended Action:

  • By when?

  • Responsible Person:

  • 5.3 Quality Records Complete As Per Requirements?

  • Comments:

  • Recommended Action:

  • By when?

  • Responsible Person:

Painting

  • 6.1 Operations Preformed As Per Rout Card / Technical Instructions?

  • Comments:

  • Recommended Action:

  • By when?

  • Responsible Person:

  • 6.2 Quality Standard / Workmanship Acceptable?

  • Comments:

  • Recommended Action:

  • By when?

  • Responsible Person:

  • 6.3 Quality Records Complete As Per Requirements?

  • Comments:

  • Recommended Action:

  • By when?

  • Responsible Person:

Final Inspection

  • 7.1 Operations Preformed As Per Rout Card / Technical Instructions?

  • Comments:

  • Recommended Action:

  • By when?

  • Responsible Person:

  • 7.2 Quality Standard / Workmanship Acceptable?

  • Comments:

  • Recommended Action:

  • By when?

  • Responsible Person:

  • 7.3 Quality Records Complete As Per Requirements?

  • Comments:

  • Recommended Action:

  • By when?

  • Responsible Person:

Shipping

  • 8.1 Operations Preformed As Per Rout Card / Technical Instructions?

  • Comments:

  • Recommended Action:

  • By when?

  • Responsible Person:

  • 8.2 Quality Standard / Workmanship Acceptable?

  • Comments:

  • Recommended Action:

  • By when?

  • Responsible Person:

  • 8.3 Quality Records Complete As Per Requirements?

  • Comments:

  • Recommended Action:

  • By when?

  • Responsible Person:

Audit Sign-off

  • Auditor

  • Auditee

Notes

Definitions

  • AUDIT - Systematic, independent and documented process for obtaining evidence and evaluating it objectively to determine how well the audit criteria are fulfilled.

  • AUDITOR - Person who has undertaken a recognised Auditor's course either conducted internally or by a recognised External body, or person who possesses sufficient business experience and knowledge of AS/NZS ISO 9001, 14001 and/or 4801 to conduct an audit.

  • RECOMMENDED ACTION - Action to eliminate the cause of a detected non-conformity or other undesirable situation. In context of this audit, the meaning is to include action taken to rectify an identified deficiency (non-conformance or improvement opportunity), or action to prevent recurrence of a previous deficiency.

  • IMPROVEMENT OPPORTUNITY - Observations made which are provided as guidance on potential system improvement.

  • NON-CONFORMANCE - Non-fulfilment of a requirement. In the context of this audit checklist, the word "non-conformance" is used to describe conditions outside previously agreed, defined or specified requirements (including statutory requirements). It is a deficiency in documentation or procedures that reduces the quality of a material or service or introduces unacceptable risks to safety or the environment.

  • NOT APPLICABLE (N/A) - In some circumstances, the question may not be applicable to the works being audited. In this instance, N/A can be recorded against the criteria and the question and points available removed from the audit scoring process.

  • MAJOR NON-CONFORMANCE - In auditing terminology a major non-conformance indicates the absence of a system or part of the system, or that the documented systems or procedures are not being followed. A major non-conformance can be where there is an obvious and potentially threatening system discrepancy likely to expose people, the environment, or the company to high or extreme risk. Non-conformances identified as the primary cause of a significant incident, or a warranted customer complaint, are considered major. A major non-conformance may require immediate rectification if there is a threat to the environment, equipment or the safety of people.

  • PREVENTATIVE ACTION - Action taken to prevent possible occurrence of potential deficiency / adverse impact to the quality, safety and environment.

  • SYSTEM - Consists of the following elements; policy, procedures, safe work procedures, safe work instructions, environmental instructions, forms, checklists, templates, plans and tools.

  • KEY:
    C = Conformance
    IO = Improvement Opportunity
    N/C = Non-conformance
    Mn N/C = Minor Non-conformance
    Mj N/C = Major Non-conformance

  • SCORING SYSTEM:
    Conformance (C) = 3 points
    Improvement Opportunity (IO) = 2 points
    Minor Non-conformance (Mn N/C) = 1 point
    Major Non-conformance (Mj N/C) = 0 points

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.