Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Mardyke Farm. South Dagenham Road Essex RM13 7 RS
Local Authority PPC Permit
-
Environmental Protection Act 1990
Environmental Permitting Act 2010
Local Authority :
Pollution Prevention and Control Act, 1999
Pollution Prevention and Control (England and Wales) Regulations 2000 (as amended) -
Is the site required to hold environmental permits.
-
Are the appropriate Mobile Permits and appropriate deployments in place
-
Have any improvement programmes required by the client been completed to time?
-
Have EA quarterly reporting conditions been complied with?
-
(Dust) Are all emissions to atmosphere being measured as required ? Ensure no visible emissions extend more than 10 metres from the plant.
-
Have all mobile plant permit conditions been adhered to?
-
Images relating to this category.
Air Emissions
-
GLA/ALG best practice guidance on "the control of dust and emissions from construction and demolition sites"
The London Plan: Spatial Development Strategy for Greater London (July 2011)
the Air Quality Standards Regulations 2010 -
Is the site clean and tidy with no evidence of debris outside the site?
-
Are procedures in place to control dust or odour?
-
Is the site perimeter fencing in good condition?
-
What procedures are in place to control dust on site, what do they consist of? Are they suitable
-
Is there a wheel wash on site, what control measures, do you have for stopping mud on the road? Are they suitable?
-
Are controls in place to reduce plant, machinery and vehicle movements?
-
Images relating to this category
Noise and Vibration
-
Are measures required to address noise from site.<br><br>Vehicle Movement / Machinery noise suppressed etc
-
Are measures required to address vibrations?
-
Has a section 61 been submitted and accepted by local authority?
-
Have restrictions been placed on ECL in relation to working hours?
-
Have any complaints been received or additional restrictions imposed on working methods?
-
Has the local authority / EA served any noise notices in respect of actual or planned construction work?<br><br>What resulting controls have been put into place?
-
Images relating to this category
Waste Management
-
Environmental Pollution Act 1990 part II
Environmental Protection (Duty if care) Regulations 1991
Control of Pollution (Registration of Carriers and Seizure of Vehicles) Regulations 1991
Control of Pollution (Amendment) Act 1989
List of Wastes (England) Regulations 2005
Environmental Civil Sanctions (England) Order 2010
Environmental Permitting (England and Wales) 2010
Waste (England and Wales) Regulations 2011 -
Is all waste placed in correct location as listed on site map?
-
Does the waste note contain a declaration stating use of waste hierarchy?
-
Does the WTN contain and SIC number given by the client?
-
Has the waste been transferred to an "authorised person" I.e. a registered waste carrier?
-
Is there a copy of the disposal permit on site to ensure that they are able to accept the waste being consigned?
-
Has the waste transfer note been filled in correctly (check a sample of the completed waste transfers)
-
Images relating to this category
Hazardous Waste Management
-
Hazardous Waste (England and Wales) Regulations 2005 amended 2009 amended 2011
List of Wastes (England) Regulations 2005
Environmental Protection (Duty of Care) Regulations 1991
Environmental Civil Sanctions (England) Order 2010
Environmental Permitting (England and Wales) 2010
Waste (England and Wales) Regulations 2011
Carriage of Dangerous Goods by Road 1996 -
Does the site produce more than 500 kegs of hazardous waste per annum? If yes, provide Premises Code and expiry date.
-
Are all hazardous wastes correctly labelled, secured and stored?
-
Are all hazardous wastes correctly identified?
-
Has the waste been transferred to an "authorised person" ie a registered waste carrier?
-
Is there a copy of the disposal permit on site to ensure they are able to accept the waste being consigned?
-
Are the hazardous waste consignment notes being used correctly?
-
Are records of hazardous wastes being kept as required? Are Part E's being returned?
-
Images relating to this category
Environmental Permitting
-
Landfill (England & Wales) 2002 amended 2009
Environmental Permitting (England & Wales) Regulations 2010 -
Does the site require an environmental permit, if yes give details<br><br>Permit for restoration variation number EPR/QP3196NT/003. Used along side original permit WML 80124<br>Permit for crushing on site EPR/MB3883AN. Deployment issued No; MB3883AN/D001
-
Images relating to this category
Water Discharges & Works on or Near a Water Course
-
Water Resources Act 1991 amended 2009 and water act 2003
Environmental Permitting (England & Wales) Regulations 2010
Environmental Civil Sanctions (England) Order 2010
Land Drainage Byelaws 1991
Flood defence consent
Salmon and Freshwater Fisheries Act 1975
EU Habitats Directive -
Is there a requirement to treat or remove water from site?
-
Images relating to this category
Civil Legislation Nuisance
-
Environmental Protection Act Part III
-
What neighbouring residents and/ or companies are there adjacent to the site?
-
What nuisance or negligence issues have been raised by neighbours?
-
Are they been recorded?
-
Have any of these been subject to an abatement notice?
-
Images relating to this category
Planning and Contaminated Land (Environmental Conditions) Environmental permitting act 1990 as amended by s. 57 of the Environment Act 1995 The contaminated land (England) Regulations 2000 Planning conditions
-
Condition 3 planning Operating hours 8:00 to 18:00 Mon - Fri 8:00 to 13:00 Sat
-
Condition 4 and 5 Noise monitoring to be recorded for one hour to include L90 and LAeq levels, weather, source of noise. Noise emissions submitted to the LA at least three monthly
-
Condition 6 All vehicles and plant to be sliced and maintained in accordance with manufacturers specification
-
Condition 7 Dust emissions to be recorded and reported to the LA Stabilisation soil mounds Restricted operating when high winds or during inclement weather Use of bowser on dry roads Surfaces roads between site entrance and compound Speed limit on vehicles while on site
Hazardous Substances
-
What pesticides / herbicides are used on site? Who applies them
-
Control of Pollution (Oil Storage)(England) Regulations 2001
-
What oil tanks are used on site?
-
Does storage comply with the requirements of the oil storage regulations?<br>
-
Are all bowsers padlocked at all times?<br><br>
-
Is there evidence of spill kits in areas where spills are likely?<br>
-
Are the spill kits appropriate for the materials on site?
-
Is there evidence of leaks from overfilling from fuelling points
-
What 205 litre oil drums are used?
-
Images relating to this category
Wildlife (Ecology)
-
Wildlife and Countryside Act 1981
Protection of Badgers Act 1992
Conservation ( Natural Habitats etc.) Regulations 1994
Countryside and Rights of Way Act 2000
Plant Protection Regulation 2011 -
Has an ecological survey been carried out on site?
-
Are Japanese knotweed, giant hogweed or other invasive species isolated away from the working areas
-
What measures are in place to incorporate ecology into the working plan
-
What pest control measures in place at this site
-
Site Security & Housekeeping
-
Is the site boundary secure and entrance gates secured out of working hours? Any evidence of trespass? Access and security arrangements clearly defined? Is the Environment Agency sign on entrance gate?
-
Does the site have CCTV or 24 hour security?
-
Images relating to this category