QUALITY CONTROL CHECKLIST
-
Project Name:
-
Project Nr:
-
Completed By :
-
Sub-Contractor:
-
Relevant Drawing’s:-
-
Temporary works required (Please Indicate)
-
YesIf Yes Please attach Temp works sheet
-
Area/Location:
-
Description:
-
Item for Inspection
-
Sub-Contractor
-
Erection sequence agreed
-
HD Bolts position checked for line and level
-
Bolts moving freely – cones cleaned out
-
Pre-finished steelwork inspected prior to erection
-
Columns and beams erected as per drawing no
-
Temporary bracing required
-
All connections- bolted and torqued?
-
welded and tested?
-
Door opening steelwork checked off blockwork drawings
-
Window opening steelwork checked off blockwork drawings
-
Cladding rails installed
-
Roof Purlins installed
-
Steelwork lined and levelled and ready for grouting
-
Final Paint touch up
The above works have been inspected and : -
-
Are to an acceptable standard of quality
-
Are to an acceptable standard of quality subject to the comments below
-
Are not to an acceptable standard of quality
-
Signed on Behalf of MCE
-
Date:
-
Signed on Behalf of Client :
-
Signed on Behalf of SubContractor :
-
Date: