Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Mascott QCC-Steel Staircases
-
Sub-Contractor:
-
Relevant Drawing’s:-
-
Temporary works required (Please Indicate)
-
Yes If Yes Please attach Temp works sheet
-
Area/Location:
-
Description:
-
Item for Inspection
-
Confirm drawings are correct and the stairs will fit
-
Confirm lifting arrangements
-
Confirm access arrangements
-
Confirm steel frame is lined and bolted/structure is set
-
Confirm that required edge protection is installed in advance of stair delivery
-
Confirm that ground under where stairs are to be laid is flat, level and free from obstructions
-
Confirm that a safe method of loading of lorries is employed
-
Confirm area around lorry is cordoned off
-
Check that necessary openings have been left out
-
POST PLACING
Post Placing
-
Confirm that stairs are properly set and fixed down
-
Confirm threads are level
-
Confirm that slabs are not chipped or damaged
-
* Delete as applicable
-
The above works have been inspected and : -
-
The above works have been inspected and : -
-
Are to an acceptable standard of quality
-
Are to an acceptable standard of quality
-
Are to an acceptable standard of quality subject to the comments below
-
Are not to an acceptable standard of quality
-
Signed on Behalf of MCE:
-
Date:
-
Signed on Behalf of Client :
-
Signed on Behalf of SubContractor :
-
Date: