Title Page
-
Site conducted
-
Conducted on
-
Inspected by
-
Location
-
DA number
-
Building Company undertaking works?
-
Disclaimer: Our investigation is limited to the specific matters related to the mandatory building notification, unless stated otherwise in this report. The assessment and conclusions are the professional opinion of the City of Onkaparinga, based on the observations made and the experience of the Accredited Professional. All conclusions are relevant to the date of inspection.
Administration
-
Mandatory notification received?
Roof Inspection
-
Is the Roof a Trussed Roof?
-
Are roof trusses labelled as per approved plans and details?
-
Location of Special Loads
-
Bottom Chord Clear of non-Loadbearing Walls
-
Truss Tie Downs Ok?
-
Truss Boots Ok?
-
Trusses Tied to Load Bearing Wall?
-
Top Chord Restraint?
-
Is the roof Conventionally Framed?
-
Roof constructed in accordance with approved Layout?
-
Bracing in accordance with approved layout
-
Tie Downs
-
Transfer of wall framing
-
Bottom Stabilizers
-
Rafters
-
Hanging Beams
-
Under Purlins
-
Strutting Beams
-
Hip Rafters
-
Struts
-
Connections
-
Additional Items / comments
-
Image of Marked up roof plan
Wall Framing Inspection
-
Single Storey / Ground Floor Wall Framing
-
Top and bottom plate sizes?
-
Noggins Max 1350 Centres
-
Studs located correctly
-
Bottom plate fixings
-
Lintel sizes and locations
-
Jamb Studs sizes
-
Wall bracing / strapping
-
Second Storey wall framing
-
Top and bottom plate sizes
-
Noggins
-
Studs
-
Bottom Plate fixings
-
Upper wall frame tie downs
-
Lintels
-
Jamb Studs
-
Wall Bracing
-
Pitching Beams
-
Additional items / comments
-
Image of marked up wall plans
Glazing in Bushfire Zone
-
Is the glazing installed? If within 400mm of ground - take photo of compliance sticker
Floor Framing Inspection
-
Is a floor framing inspection required?
-
Bearers
-
Joists
-
Floor Truss
-
Bracing
-
Load paths
-
Additional items / comments
-
Image of marked up floor plan