Ductwork and fittings comply with specification
-
Fire dampers comply with specification
-
Dampers and other ancillaries are correct
-
Ductwork delivered with adequate protection
-
Ductwork delivered undamaged
-
Ductwork installed to correct levels
-
Ductwork secure and adequately supported
-
All turning vanes, splitters and dampers fitted correctly
-
Fire dampers fitted and built in correctly
-
Access doors for dampers and fire dampers fitted
-
Duct supports allow for insulation and vapor seal
-
All drop rods are correct length
-
Open ends protected during installation
-
Flexible connections fitted correctly
-
Motorised dampers installed correctly
-
All controls and damper actuators fitted
-
Ductwork tested as per specification
-
Fire dampers tested and re-set through access doors
-
Grilles and diffusers fitted correctly
-
Adequate provision for maintenance
-
Valves labelled