Title Page

  • Site conducted

  • Reason for audit

  • Conducted on

  • Prepared by

  • Plot Number

Pre install

  • Enter drawing number and Rev installed too

  • All applicable drawings available and up to date- I.E Plot layout/kitchen drawings/RCP

  • Date of install

Electrical installation

  • If any failed response add picture and create action

Backboxes and general 1st fix cabling

  • Has all KO boxes been installed correctly where applicable including grommits for cable entry

  • Are all cables installed in designated zones

  • Cable zones to adhere too Building regulations Part P

    download.png
  • All Cables using there own fixings for support, I.E not resting on pipe work etc

  • Have all lighting points been installed to the drawing

  • Have all cables above ceiling been marked to be brought through ceiling by fixers

  • Has all lighting been wired as per the drawing switch lines

  • Have all ELV points been wired where applicable

  • Has the Stats been wired, and located in correct location, I.E away from windows, and radiators where applicable

  • Has shaver and towel rail been wired in bathroom/en-suite where applicable

  • Has all sockets been installed in ring format, with min 2 separate ring final circuits in apartment

  • Has sperate Hob and Oven supply been installed from DB

  • Cable penetrations are spaced minimum of 50mm apart from each other and not excessively bunched

  • Non combustible fixings have been used to support all cabling with fixings either side of protected walls maximum of 300mm where cables penetrate

  • Cables to use own fixings as support and not mechanical pipes including sprinkler

  • Cables entering fire walls are horizontal

  • Cables that enter fire compartment walls have min of 20mm radius of free space for fire stopping

  • Picture of installation for above

Apartment General accessories

  • Have all wall accessories been installed to the drawings (sockets, switches etc)

  • Have all accessories been installed at the correct heights - Heights as ADM- low level 455mm FFL mid level- 1195mm FFL

  • Heights of accessories to adhere too- Building regs Part M

    elecsa_feb_main.jpg
  • Has all accessories been installed at least 300mm from internal walls as per life time homes

  • Has all accessories been installed to setting out distances from door frame to allow architrave/or centre of wall Min 100mm

  • As per picture

    a.jpg
  • All adjacent accessories are spaced 50mm apart

  • All stacked accessories are in line with each other (edges or centre lines up etc)

  • Has the cupboard heating controls been installed in the correct place inc isolators, flex outlets etc

  • Has all supplies in the PUC cupboard been provided, to allow for third party equipment I.E BT and isolators for fixed accessories where applicable

  • Has the kitchen circuits been installed, and any accessories 100mm away from edge of hob and 300mm away from edge of sink. 150mm minimum from work top height

  • The location of distribution board has neatly been installed to allow 2nd fix installed at a height of switches between 1350-1450mm

  • Has the sockets been installed to allow for a king size bed in the master

  • master Bed setting out detail

    b.jpg
  • Domestic Smoke/heat detector not sited within 300mm of wall/vent/heat source (light)

  • Heat detector installed a distance away from heat source (hob/oven) to stop un-wanted activation- (installed within 5M from walls in kitchen- but further than 1m away from hob)

  • Take pictures of our installation as per above

Project specific

  • Has intumescent gaskets been installed on party walls and internal corridors if required

  • Conduit sleeve being used while passing a FED letter box finished 25mm either side allowing fire stop to be completed

  • Has DNO approved ducting been installed to allow for lateral mains where applicable

  • few Photos of finished plot in general

Post Install

  • Has the Plot been left free from damage from our installation

  • take photo

  • Has the plot been left clean and tidy

  • take photo

  • Has there been any changes that needed to be made from original drawing

  • What has changed and why

  • Photo of drawing showing change and photo of install for as builts

  • Any customer extras that are not shown on original drawings

  • Photo of changes in plot

Sign off

  • Who 1st fixed this plot

  • Signature on completion

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.