Title Page

  • Project

  • Client

  • Conducted on

  • Prepared by

  • Location
  • Plot Number

  • System Inspected

  • Ductwork and fittings comply with specification

  • Fire dampers comply with specification

  • Dampers and other ancillaries are correct

  • Ductwork delivered with adequate protection

  • Ductwork delivered undamaged

  • Ductwork installed to correct levels

  • Ductwork secure and adequately supported

  • All turning vanes, splitters and dampers fitted correctly

  • Fire dampers fitted and built in correctly

  • Access doors for dampers and fire dampers fitted

  • Duct supports allow for insulation and vapor seal

  • All drop rods are correct length

  • Open ends protected during installation

  • Flexible connections fitted correctly

  • Motorised dampers installed correctly

  • All controls and damper actuators fitted

  • Ductwork tested as per specification

  • Fire dampers tested and re-set through access doors

  • Grilles and diffusers fitted correctly

  • Adequate provision for maintenance

  • Valves labelled

Completion Sign Off

  • Checked By MBS

  • Name

Client Sign Off

  • Checked by Client

  • Name

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.