Site Manager
-
Is there an SMSTS qualified Site Manager present on site?
-
Is a copy of the certificate within the site file / available electronically?
-
Does the Site Manager hold a gold or black CSCS card?
-
Is there a trained first aider (3 day FAAW) on site at all times?
-
Is a copy of the certificate within the site file/available electronically?
-
Is there a trained fire warden on site at all times?
-
Is a copy of the certificate within the site file/available electronically?
-
Does the Site Manager hold a valid Temporary Works Supervisor certificate?
-
Is a copy of the certificate within the site file/available electronically?
-
Does the Site Manager hold a valid Asbestos Awareness certificate?
-
Is a copy of the certificate within the site file/available electronically?
-
Are there any Client specific training requirements - if so have they been completed?
COVID-19
-
Are all access and egress points controlled, are hand sanitisation points placed at all entrance and exit points?
-
Is there adequate segregation and social distancing on site? This includes between operatives within the work area and between operatives, store colleagues and the general public?
-
Are face covers worn by all operatives where required? (note exclusions for specified health conditions)
-
Detail those who are not wearing face covers - name and company
-
Note: ensure current requirements are communicated to all operatives - including contractors
-
Is clear signage displayed regarding hand washing, social distancing at site entrance/exit points and at strategic places across the site?
-
Is there a cleaning regime/rota in place?
-
Does it include welfare facilities, toilets, handles etc?
-
Is plant and equipment included in the regime (this can be managed by the subcontractor but must be available and cleaning recorded)?
-
Has a break time rota been shared with site operatives including a cleaning rota?
-
Have all operatives been made aware of social distancing and hand washing requirements using the WhatsApp tool box talk?
-
Have all operatives signed the relevant contractors COVID-19 risk assessment?
-
Have all operatives completed a COVID-19 health questionnaire?
-
Has anyone left site due to self isolating requirements due to COVID-19?
-
Has this been reported to the contractor's senior management team within 3 hours?
Plans & Construction Information
-
Is a suitable traffic management plan on site?
-
Is a suitable fire plan on site and displayed?
-
Is the Pre Construction information available on site.
-
Is a current program of works available?
-
Is the Construction Phase Plan / Small works plan or CPP addendum contained within the site file?
General safety & documentation
-
Have all operatives been inducted - carry out random check (this includes visitors)
-
List operatives that have not been inducted
-
Are all induction forms completed correctly and training certificates recorded?
-
Is a current valid insurance policy displayed on site?
-
Is a Health & Safety at Work poster displayed in a prominent position with the contact details completed?
-
Are the site rules displayed on site?
-
Are the daily hazards on display?
-
Is the project notifiable?
-
Is the F10 displayed in a prominent position (site entrance and notice board)?
-
Is there temporary lighting on site?
-
Is it adequate for the size of the site and the type of work being carried out?
-
Are trailing cables managed on site?
-
Are there any temporary electrical supplies?
-
Are certificates available?
-
Is the site clean and organised - is housekeeping of a good standard?
Environmental
-
Are there COSHH items on site?
-
Is there a spill kit suitable for the amount of COSHH items present?
-
Are all COSHH items stored as per the manufacturers instructions and in a suitable size bund?
-
Are COSHH risk assessments available for all COSHH items on site?
Asbestos
-
Was the building erected prior to 2000?
-
Has a suitable and sufficient refurbishment and demolition survey been completed?
-
Have any asbestos removal works taken place?
-
Has reassurance monitoring been carried out and rehabitation certificate issued (copies must be available)?
-
What year was the building constructed?
-
Is there an Asbestos Grab bag on site.
Site Perimeter
-
Is there Heras fencing to the site perimeter?
-
Is the site perimeter/fencing free from damage, with no sharp edges? Are Heras fencing panels the correct way around?
-
Is entry controlled via gates or doors?
-
Are they secure - are locks (digilocks included) in use?
-
Are Heras fence bases / chapter 8 legs suitable for pedestrianised areas (Hi-Viz/stubby feet)?
-
Are there two clips per panel?
-
Does the Heras fence have signage or Monoflex attached?
-
Are calculations available and present on site?
-
Is the site secure from unauthorised access - including rear and additional access/egress points?
-
Is there fixed hoarding on site?
-
Is the entrance controlled by secured gates / doors?
-
Is the site secure from unauthorised access - including rear and additional access/egress points?
-
Are calculations available for the hoarding?
-
Does the site present a positive image of MCC and the contractor
-
Detail the issues identified / areas for improvement
Welfare facilities
-
Are there adequate toilets on site? Chemical toilets, one for every seven operatives working a 40hour week. Or one urinal and one cubicle for 1-15 persons
-
Is there hot water, liquid soap and means of drying hands available?
-
Is there adequate toilet paper available?
-
Are welfare facilities clean and tidy? (this includes toilets and rest areas)
-
Is the site canteen/rest area large enough for the number of operatives on site (is there a sufficient number of tables and chairs)?
-
Is there a break rota for smaller welfare units that facilitates the number of contractors reasonably?
-
Does the site canteen/rest area have?:
- Seats with backs
- Heating
- Adequate drinking water supply
- Microwave
- Drying room
First Aid & Fire Extinguishers
-
Are the First Aid supplies adequate for the work taking place? (Where hot works are taking place, a Burns kit must be present on site)
-
Are there an adequate number of fire points on site? (for the size of the project and number of floors)
-
Is there evidence of weekly checks taking place of fire alarm systems (recorded on the back of the fire risk assessment) - note fire alarm systems must be linked
-
Are all fire extinguishers in date and in a usable condition, pressure & serviceability?
PPE
-
Is correct PPE being worn inline with MCC and the contractors requirements?
-
Is task specific PPE being worn as specified in RAMS?
-
Is all PPE in good condition, presentable and sufficient for the tasks being carried out?
Waste & Recyling
-
Is there a designated area for waste management?
-
Is the area adequately segregated?
-
Is waste appropriately seperated?
-
Are wait and load services being used?
-
Is waste managed effectively, with no build up of combustible materials?
Subcontractors
-
Are RAMS available for all contractors on site?
-
Is there evidence that RAMS have been evaluated?
-
Have all operatives read, understood and signed their RAMS
-
Are all subcontractors (including directs) working in accordance with site rules?
-
Detail non-conformances/issues reported by Site Manager
-
Number of contractors on site at time of visit?
-
Have all operatives signed in and out each day?
Working at Height
-
Is any work at height being carried out?
-
Which work at height activities are taking place?
- Stepladders
- Podiums
- Hop-ups
- PASMA towers
- MEWPS/Scissor lifts
- Scaffolding
-
Has a low level access permit been issued to the relevant contractor carrying out the works, with daily checks carried out by the site manager (recorded on the back of the permit)?
-
Is all work carried out from stepladders low intensity and short duration?
-
Are all operatives using work at height equipment working safely?
-
Are training certificates available for those working at height (IPAF/PASMA etc)
-
Does all work at height equipment have the necessary documentation?
-
Mewps require thorough examination certificate (sticker is not adequate) and daily pre-use checks(need to be recorded). PASMA towers must have user manual provided. Stepladders should be inspected. Traditional ladders /domestic ladders are not permitted on site
Scaffolding
-
Is there a scaffold erected on site?
-
Has it been erected in accordance with a design or TG20 compliance document (is a copy of the document available)?
-
Has a handover certificate been issued - does the description detail the scaffold erected on site?
-
Are seven day inspections carried out by a competent person (advanced scaffolder/CISRS inspector)?
-
Is a copy of the inspection available on site? (Note: this document must be provided by the inspector)
-
Have tie pull tests been carried out?
-
Are records available and tested ties marked/tagged?
-
Is a pavement license required?
-
Is a copy of the permit on site and all conditions complied with?
-
Visually check the scaffold - are all toe boards in place and secured? For pavement lifts - there must be protective feet, foam coatings, lighting, signage and advanced warning to vehicular traffic (if close to road) - pavement lifts must be double boarded with a layer of protective material to prevent dust. Debris netting must be included with the design or TG20 compliance document.
Dust
-
Are any dust generating activities taking place on site?
-
Is the dust being managed adequately?
-
Are FFP3 (FFP2 if none available due to COVID-19) masks available?
-
Is there evidence on site of face fit tests for mask users (check mask brand - it must be the same as on the face fit test)?
-
Is on tool dust extraction being used (Class M minimum) on all cutting equipment
-
Are any additional dust management measures required?
Hot Works
-
Are hot works being carried out at the time of the audit?
-
Has a hot work permit been issued for the task?
-
Do all operatives carrying out hot works have the correct PPE?
-
Have all combustible materials been removed from the working area?
-
Are suitable fire extinguishers available in the immediate area (these must not be taken from the fire points)?
Electrical
-
Is any live electrical work taking place on site?
-
Has a permit been issued to the relevant contractor?
-
Are lock off procedures in place?
-
Is access to electrical cabinets/boards controlled? Is warning signage displayed?
-
Is there any first fix (non-live) work being carried out?
-
Has portable appliance tested been carried out? All items including chargers - 110v every 3 months, 240v -12 months
Excavations
-
Are excavations taking place?
-
Have permits been issued?
-
Has a C.A.T. (Cable Avoidance Tool) and Genny scan / GPR (Ground penetrating radar) survey been carried out of all areas where works are taking place?
-
Are thorough examination and calibration certificates available for the CAT and Genny?
-
Are training certificates available for operatives using the CAT and Genny?
-
Have records been kept of the scan or survey and are they available on site?
-
Have buried services been marked on the ground with marker paint?
-
Are service drawings available?
-
Are insulated tools being used for digging within 600mm of services?
-
If plant or equipment is being used, do operatives hold the correct competences and are all thorough examination and pre-use checks available?
-
Are all excavations suitably protected?
Temporary Works
-
Are there any temporary works activities taking place on site?
-
Has the temporary works co-ordinator and supervisor been identified and detailed on site?
-
Is all temporary works documentation completed and up to date? (including the temp works register?
Lifting Operations
-
Are lifting operations taking place?
-
Are lifting plans in place?
-
Are control measures in place to protect site personnel and the general public? Detail control measures/take photo?
Audit close out
-
Detail any concerns raised during the audit - add positive comments, feedback, suggestions for improvement etc.
-
I confirm as the Site Manager of this project that the non-conformances detailed within this report have been explained to me by the auditor, and a plan for corrective actions has been discussed. I have been given the opportunity to discuss the issues identified with the auditor