Title Page
-
Conducted on
-
Prepared by
-
Location
Safety
-
The area is safe and free from hazards
-
Employees within the area understand and demonstrate the key safe behaviours
CCP
-
The metal detector is functioning correctly and checks complete in accordance to procedure have been observed, the reject line door is kept locked
Chemical Control
-
All chemicals stored in locked COSHH cabinets when not in use including ink and additive CGEN.04
Paperwork & Documentation
-
All paperwork is on the correct Centuri document number
-
All paperwork is correctly completed and any corrections have been made in accordance with the Paperwork - Record Completion & Maintainance procedure
-
Weight checks complete in accordance with OLYMPAC 24 Sartorius In Line Testing and Reports
-
Each order has been correctly documented, including julien code and box label checks
-
Daily and monthly glass registers are up to date
-
The knife control procedure is being followed and all documentation is up to date
Hygiene & Fabrication
-
The area is clean, free from foreign bodies, debris and excess grease
-
End of line equipment including conveyors and metal detector are clean and free from debris internally and externally
-
Absence of selotape engineering
-
All floors and drains are clean and free from debris. Boot Wash has chemical and is dosing correctly
-
Cleaning equipment such as brushes are clean and stored on the correct shadow boards. CGEN 03.
-
Cleaning schedules are complete and up to date for daily, weekly and monthly tasks
-
Internal building fabrication such as walls and floors are in a good state of repair
-
Logoplaste room floors , conveyors , fire door shutter and drip trays cleaned and audit ready
-
Mezzanine platform floor , conveyors and drain baskets cleaned and audit ready
Operator Asset Care
-
The Inkjet OAC schedule is up to date for daily, weekly and monthly tasks
-
The Logopak OAC schedule is up to date for daily, weekly and monthly tasks, label stocks have been replenished
-
The Filler OAC schedule is up to date for daily, weekly and monthly tasks
5s
-
Area audits complete to schedule and evidently compliant with visual standards
-
Box erector tare checks are complete with evidence of 3 strips of glue and stored on the pallet for conformation<br>
-
Yellow cabinet cleaned and refilled with consumable items if required.
-
All SIC boards are up to date with actions when hourly targets have not been met
-
Any packaging which has an NCN has been removed from the area, including corridoor
Other Comments
-
Verified by: