Information
-
Event Name
-
Event Number
-
Client Name
-
Conducted on
-
Prepared by
-
Location
Exhibition Build and Layout
-
Does the final build and layout match the approved floor plan?
-
Are the paths of travel to exits free of obstructions?
-
Have temporary exits signs been installed?
Rigging
-
Have all rigging works been carried out by accredited rigging contractors?
Electrical Safety
-
Are electrical equipment and/or cables tested and tagged to comply with AS/NZS 3760 In-service Safety Inspection and Testing of Electrical Equipment?
-
Have electrical safety certificates been provided for all temporary electrical works?
-
Have any potential electrical hazards with cable management been addressed?
Stand Design / Layout
-
Are all stands inside their allocated space (not encroaching aisle)?
-
Do stands with enclosed roof areas have adequate fire safety measures in place?
-
Is flooring and edge ramping secure (not a trip hazard)?<br>
-
Have all potential trip hazards been addressed?
-
Has an engineer inspected and certified any stand requiring certification? (stands with a second storey that will be occupied and steel structures)
Theatre / Seminar Areas
-
Are seats tied together?
-
Is there adequate egress to emergency exits?
-
Have temporary exit signs been installed? <br>
Smoke Detector Isolations
-
Have isolations and fire wardens been booked as required?
Motor Vehicle Displays
-
Are fire extinguishers and a drip trays in place?
Cooking Stages/Demonstrations
-
Is adequate fire safety equipment in place? (fire exstinguisher/fire blanket)
-
Has the organiser agreed to remove LPG bottles for overnight storage?
-
Have any public safety risks associated with hot surfaces/naked flames been adequately controlled?
Miscellaneous
-
Do the above questions cover all issues?
Client Sign Off
-
Noting these comments, I assure MCEC that the above listed event is in accordance with the submitted Safety Plan and all other relevant points in the MCEC Operations Manual and License Agreement.
-
Client Signature