Title Page
-
Conducted on
-
Mentors Name
-
Name of New Driver
-
Working Area
-
Driving Licence No
-
Driving Licence Exp Date
-
ADR No
-
CPC Hours Completed
Training Completed (Answer Yes or No as required)
-
Circle Checking
-
Defecting and use of weekly documentation
-
Use of Big Change Tablet System
-
Coupling and Uncoupling procedures (Highlight hydraulic lines, tipper, twinline)
-
Induction on each trailer operation (job specific)
-
TLV - Operation of Deck
-
TLV - DISCUSSION - Loading procedures, use of safety bars and part load bars (upper position and shoring casks)
-
Tanker Operations - Discussion and Practical - bi-products, whisky tanks (old style, new style with double handrails, interlocks, airvalves etc and Hybrid Tanks)
-
Curtainside Vehicles - Operation and Load restraining procedures
-
Tippers - Explain TASCC requirements (sanitising, record of previous 3 loads)
-
Hydraulics
-
Site Induction - Sign in to site, weigh Vehicle, report to site operator, inducted on each load or unload procedure for product on each site
Distilleries or Sites Inducted
-
Distillery or Site - Inducted where
-
Highlight what Loading/Unloading inducted on
-
Distillery or Site - Inducted where
-
Highlight what Loading/Unloading inducted on
-
Distillery or Site - Inducted where
-
Highlight what Loading/Unloading inducted on
-
Distillery or Site - Inducted where
-
Highlight what Loading/Unloading inducted on
-
Distillery or Site - Inducted where
-
Highlight what Loading/Unloading inducted on
-
Distillery or Site - Inducted on
-
Highlight what Loading/Unloading inducted on
-
Distillery or Site - Inducted on
-
Highlight what Loading/Unloading inducted on
-
Distillery or Site - Inducted on
-
Highlight what Loading/Unloading inducted on
-
Distillery or Site - Inducted on
-
Highlight what Loading/Unloading inducted on
-
Distillery or Site - Inducted on
-
Highlight what Loading/Unloading inducted on
-
Distillery or Site - Inducted on
-
Highlight what Loading/Unloading inducted on
-
Distillery or Site - Inducted on
-
Highlight what Loading/Unloading inducted on
-
Distillery or Site - Inducted on
-
Highlight what Loading/Unloading inducted on
-
Distillery or Site - Inducted on
-
Highlight what Loading/Unloading inducted on
-
Distillery or Site - Inducted on
-
Highlight what Loading/Unloading inducted on
Signed by New Driver to confirm as having received the above Inductions and that you have read and understood the driver manual at its Current AL
-
Name
-
Signature
-
Date
Mentor Drivers Comments
-
Please Confirm if the new driver is:
-
Mentors Comments
Mentors Details
-
Name
-
Signature
-
Date