Information
-
Areas inspected
-
Department
-
Conducted on
-
Prepared by
-
Inspection team
In-pit Refuelling Facility
-
Was the in-pit refuelling facility inspected?
-
Are there any outstanding action items arising from previous Contacts, Internal Audits, Inspections etc?
-
If yes, have they been adequately addressed/closed out?
-
Stormwater ingress onto the refuelling pad is managed.
-
Contaminated water runoff from pad is prevented by rollover bunds and suitable gradients.
-
Refuelling liner buried and intact.
-
No evidence of large spills/leaks.
-
No leaks from pipework and fittings.
-
Waste products segregated and disposed of correctly.
Summary of actions
-
Are actions required to be raised?
Action
-
Action Number
Sign offs
-
Area owner representative
-
Environmental representative