Title Page
-
Site conducted
-
Contracts Manager
-
Conducted on
-
Site Foreman
-
Section (1). ARE MDS PRINCIPLE CONTRACTOR?
-
(1.1) Are relevant public information signage displayed? (including site managers details)
-
(1.2) Are means in place preventing unauthorised public access onto site i.e. gate person
-
(1.3) Has perimeter fencing been installed?
-
(1.4) F10 displayed?
-
(1.5) Construction phase plan/issued/ up to date?
-
(1.6) Adequate welfare facilities provided in proportion with number of operatives?
-
(1.7) Induction process site specific?
-
(1.8) H&S boards displaying the correct statutory information - HSE poster, Insurances, policies?
-
(1.9) Site rules in displayed?
-
(1.10) Fire & Emergencies procedures in place including location of fire points, muster point?
-
(1.11) Emergency exit/routes clearly identifiable and free from obstruction?
-
(1.13) Site Manager, First Aider, Fire warden appointed?
-
(1.14) Fire risk assessment carried out?
-
(1.15) First Aid provisions in place?
-
(1.16)) Warm water supplied for washing?
-
(1.17) Adequate supplies of soap and sanitiser?
-
(1.18) Means to dry hands?
-
(1.19) Canteen facilities present (including microwave, fridge, drinking water and kettle)?
-
(1.20) Drying room present?
-
(1.21) All areas adequately heated and lit?
Section (2) DOCUMENTATION
-
(2.1) Have all staff been inducted?
-
(2.2) Are daily briefings being carried out?
-
(2.3) Are RAMS in use 'current', been briefed and signed by all operatives?
-
(2.4) LOLER register up to date?
-
(2.5) 6/12 monthly lifting equipment/accessories certificates available?
-
(2.6) PUWER register up to date?
-
(2.8) Toolbox talks being carried out?
-
(2.9) HAVI sheets completed?
-
(2.10) Excavation inspections carried out? (paperwork completed)
Section (3) Welfare
Section (4) PERMITS
-
(4.1) Permits related to the task issued?
-
(4.2) Have relevant information been issued along with permits i.e. service drawings?
-
(4.3) Operative trained to carry out works associated with permits e.g. Confined space
Section (5) PLANT & EQUIPMENT - LOLER/PUWER
-
(5.1) Operators carrying out daily checks on plant/equipment inc buckets?
-
(5.2) Is plant being maintained by operator i.e. greasing?
-
(5.3) Mirrors, glass, audio warnings, cameras free from defects?
-
(5.4) Equipment requiring calibration within calibration period?
-
(5.5) Viewed lifting equipment/accessories free from defects?
Section (6) COSHH
-
(6.1) COSHH assessments/MSDS on site?
-
(6.2) Are all COSHH items suitably stored?
-
(6.3) Spill kits available and proportionate for task?
-
(6.4) Appropriate signage in place ?
-
(6.5) Drip trays present to fixed plant and at refuelling areas?
Section (7) PPE
-
(7.1) Company issued PPE kept in a presentable serviceable condition?
-
(7.2) Are all employees issued with MDS branded PPE?
-
(7.3) PPE used fit for the task?
-
(7.4) Task specific PPE worn?
Section (8) EXCAVATIONS
-
(8.1) Are excavations being carried out?
-
(8.2) Permit to dig in place?
-
(8.3) Interlocking barriers used?
-
(8.4) Secure access & egress in place?
-
(8.5) Appropriate signage in place?
-
(8.6) Are trench support systems in use?
-
(8.7) Temporary works design in place?
-
(8.8) Temporary works supervisor appointed?
-
(8.10) Rescue equipment in place e.g. Davit Arm, Harness
Section (9) SUMMERY OF INSPECTION
-
Photos
-
(9.1) Comments
-
(9.2) Inspecting Manager
-
(9.3) Site Manager/Supervisor