Information
-
Conducted on
-
Piling Rig
-
Contract + No.
-
Personnel/Site Operatives
-
Location
-
Prepared by
A: SITE ACCOMODATION & WELFARE
-
1. Are suitable welfare facilities provided on site
-
2. Are suitable rest areas provided.
-
3. Are food eating/heated areas provided.
-
4. Is there facilities for drying/changing clothes.
B: SAFE PLACE OF WORK
-
1. Is a safe means of access/egress provided for personnel?
-
2. Is work area firm, level & suitable (free from trip hazard).
-
3. Is segregation in place?
-
4. Is Franki's work area tidy (Housekeeping).
C: SITE ACCESS & TRAFFIC ROUTES
-
1. Are vehicles & pedestrians segregated?
-
2. Are traffic marshals employed to direct traffic on and off site?
D: GENERAL ITEMS
-
1. Are there any services within the piling area.
-
2. If yes to the above are they signed and marked.
E: STORAGE & MOVEMENT OF MATERIAL
-
1. Is there a safe clean segregated working area for steel fixers?
-
2. Are fire extinguishers located around the fuelling station and the correct type?
F: PPE - PERSONAL PROTECTIVE EQUIPMENT (Is correct PPE in use)
-
1. Is standard 5-point PPE in use?
-
2. Are there any site-specific special requirements for PPE?
-
3. Is the pump operator wearing hearing protection, eye protection, and waterproof gloves?
G: RIG / FOREMAN DOCUMENTATION
-
1. Daily / Weekly Plant Inspection Checklist completed. (LOLER PUWER)
-
2. Are lifting certificates on site and in date?
-
3. Piling platform certificate completed & available.
-
4. Permit to PIle completed & available.
-
5. Toolbox Talks completed.
-
6. Is the site specific method statement on site and signed by all Franki staff?
-
7. is the site specific Risk assessment on site?
-
8. is the site specific lift plan on site and signed?
-
9. Is the COSHH/blowing out procedures pack available for review?
H: PLANT AND SAFETY EQUIPMENT
-
1. Safety harness and lanyard in date?
-
2. Spill Kit(s) available on site?
-
3. Are drip trays in use?
-
4. Diesel Storage tank free from leaks?
-
5. Are blow out cannons in good condition? (free from defects/concrete build up)
-
6. Is the blow out containing device being used?
I: PILING RIG AND EQUIPMENT MAINTENANCE
-
1. What is the condition of augers?
-
2. Any maintenance related issues? Check F91
J: CONCLUSION
-
Comments:
-
Foreman:
-
Auditor:
-
Select date