Information
-
Site visit
-
Conducted on
-
Piling Rig
-
Contract + No.
-
Personnel/Site Operatives
-
Location
-
Prepared by
A: SITE ACCOMODATION & WELFARE
-
2. Are suitable rest areas provoded.
-
3. Are food eating/heated areas provided.
-
4. Is there facilities for drying/changing clothes.
B: SAFE PLACE OF WORK
-
1. Is a safe means of access/egress provided.
-
2. Is work area firm, level & suitable.
-
3. Working areas free of obstruction.
-
4. Is the required working area clear and available.
-
5. Is a rig exclusion zone in operation (20m >).
-
6. Is the working area tidy (Housekeeping.
C: ACCESS/EGRESS TO AND FROM WORKPLACE
-
1. Walkways wide enough for persons/mat.
-
2. Are all access areas clear.
-
3. Are all egress areas clear.
D: SITE ACCESS & TRAFFIC ROUTES
-
1. Is the site entrance clearly signed.
-
2. Is access free of over/under services.
-
3. Are all traffic routes signed.
-
4. Are vehicles & pedestrians segregated.
-
5. Can vehicles turn where required.
E: GENERAL ITEMS
-
1. Any overhead cables in piling area.
-
2. Any underground services in piling area.
-
3. If yes to above are they signed and marked.
-
5. Any ground contamination.
F: STORAGE & MOVEMENT OF MATERIAL
-
1. Are compress gases stored/secured correctly.
-
2. Are warning signs displayed.
-
3. Are the required fire extinguishers available.
-
4. Is hard standing available for pile storage.
G: PPE - PERSONAL PROTECTIVE EQUIPMENT (Is correct PPE in use)
-
Head
-
Ear
-
Hand
-
Foot
-
Body
-
Eye
-
Other Items
H: RIG / FOREMAN DOCUMENTATION
-
1. Daily / Weekly Plant Inspection Checklist completed.
-
2. Accident book - any unrecorded items.
-
3. Foreman's Health & Safety Pack in order.
-
4. Six monthly rig/tackle examination complete.
-
5. Operations manual on site ( Foreman ) & in-date.
-
6. Piling platform certificate completed & available.
-
7. Permit to PIle completed & available.
-
9. Toolbox Talks completed.
J: RIG EQUIPMENT
-
1. Safety harness available & in order.
-
2. Safety lanyard available & in order.
-
3. Karabina or links available in order.
-
6. First Aid kit in order.
-
7. Fire Extinguisher in order.
-
8. Spill Kit(s) available on site & full.
-
13. Diesel Tank/IBC Tested & Lifting Sling in-date (No Damage)
K: CONTRACT DOCUMENTATION
-
1. Risk assessment - job specific.
-
2. Method Statement - job specific.
-
3. Contract Instruction sheet available.
L: PILING RIG AND EQUIPMENT MAINTENANCE
-
Any maintenance related issues?
-
Comments:
-
Foreman:
-
Auditor:
-
Select date