Information
-
Customer
-
Site Address
-
Post code
-
Tesseract Job Number
-
Date of Inspection
-
Inspected by
-
Site reference (if applicable)
Aerial Array
-
Condition of Array and Mast - OK?
-
Remedial action is required?
-
Able to fix on site?
-
Works carried out / required?
-
Photos (if required)
-
Condition of Brackets - OK?
-
Remedial action is required?
-
Able to fix on site?
-
Works carried out / required?
-
Photos (if required)
Satellite Dish
-
Earth Bonding - OK?
-
Remedial action is required?
-
Able to fix on site?
-
Works carried out / required?
-
Photos (if required)
-
Condition of LNB - OK?
-
Remedial action is required?
-
Able to fix on site?
-
Works carried out / required?
-
Photos (if required)
-
Condition of Dish - OK?
-
Remedial action is required?
-
Able to fix on site?
-
Works carried out / required?
-
Photos (if required)
-
Condition of Brackets - OK?
-
Remedial action is required?
-
Able to fix on site?
-
Works carried out / required?
-
Photos (if required)
Head End / Repeaters
-
Is terrestrial signal within CAI specification at the head end input?
-
Remedial action is required?
-
Able to fix on site?
-
Works carried out / required?
-
Photos (if required)
-
Connectors secure / tight?
-
Remedial action is required?
-
Able to fix on site?
-
Works carried out / required?
-
Photos (if required)
-
Is equipment secure?
-
Remedial action is required?
-
Able to fix on site?
-
Works carried out / required?
-
Photos (if required)
-
Are all signal, level and quality within CAI specification at the head end?
-
Remedial action is required?
-
Able to fix on site?
-
Works carried out / required?
-
Photos (if required)
-
Earth Bonding - OK?
-
Remedial action is required?
-
Able to fix on site?
-
Works carried out / required?
-
Photos (if required)
-
Any sign of water ingress?
-
Remedial action is required?
-
Able to fix on site?
-
Works carried out / required?
-
Photos (if required)
-
Are repeaters present?
-
How many repeaters / switch locations?
-
Are all signal, level and quality within CAI specification at last switch/repeater amplifier?
-
Has issue been rectified on site?
-
Works carried out / required?
-
Photos (if required)
Cables & Connectors
-
Aerial / Dish to Head End and network cables - OK? (Check for signs of water ingress)
-
Remedial action is required?
-
Able to fix on site?
-
Works carried out / required?
-
Photos (if required)
Tray & Trunking
-
Check condition of containment / tray - OK?
-
Remedial action is required?
-
Able to fix on site?
-
Works carried out / required?
-
Photos (if required)
Landlord Power
-
Visual inspection of Landlord power - OK?
-
Remedial action is required?
-
Able to fix on site?
-
Works carried out / required?
-
Photos (if required)
-
Earth Continuity Inspection required?
-
Readings
-
If Earth Continuity Inspection is not required, visual inspection has been carried out?
-
Any defects / issues please list
Overall condition / Performance of system / additional information
-
Overall condition / performance of system?
-
Suggested remedial action (all parts and time required)
-
Any additional comments
-
Any additional photos
-
Engineer