Title Page
-
Site conducted
-
Site Name / Site Number
Indoor unit
-
1. Clean and Check filter
-
2. Check coil Condition
-
3. Clean and disinfect coil
-
4. Check pump
-
5. Check fan scroll
-
6. Check on/off coil temp Heat/Cool
-
7. Clean unit facia
-
8. Check operation
-
9.Check pipework for signs of leaks/lagging condition
-
10 Check and clean drip tray / includes insertion of anti-slime tablet / Does not include dropping drip tray or deep clean
Outdoor Unit
-
11. Check coil and brush
-
12. Check electrical connections
-
13. Check unit operation
-
14. Check unit external condition
-
15. Check on/off coil temps Heat/Cool
-
16. Check external surfaces and pipework for signs of leaks/lagging condition
-
17.Carry out F-Gas leak test
-
18. On completion of visit add the following text to sap job sheet " PPM completed in accordance with Epta PPM spec UKPPM031 Rev 01"
-
19. Obtain client signature
-
20.Update Verisae
-
21. Send IAudit PPM sheet to Service3@eptarefrigeration.com
Condition report of AC systems
-
Please add pictures of AC systems condition
-
Please add details/report of AC system condition
Sign Off
-
Engineers name
-
Engineers sign off
-
Site sign off Name
-
Site signature
-
Time/date