Information
-
Audit Title
-
Prepared by:
-
Project / area inspected:
-
Inspectors:
-
Select date
Administration / Program:
-
Workers have attended Safety/cGMP orientation. (Sub)contractor training verification
-
Emergency response, evacuation plans and rescue procedure in place, muster points posted in field.
-
First aid trained personnel on project, mutual aid contacted and verified.
-
Procedure for recording and investigation of incidents, first aid cases and near misses. (Fear factor of reporting is addressed)
-
Incident log (IE OSHA 300 log) being maintained, case management and return-to-work process.
-
Safety bulletin board with safe workdays posted and current safety information.
-
Contractor toolbox safety meetings held weekly, with intermittent Merck/CM participation.
-
Merck/CM led town halls being done.
-
(Sub)Contractors competent persons identified.
-
CM weekly safety meetings held with (Sub)contractors supervision.
-
MSDS provided to Merck, maintain in field office.
-
Job Safety Analyses / risk assessment / method statement completed as needed / required.
-
Distracted working and outside influences are addressed in planning.
-
Daily task safety planning completed, and white board coordination meetings help.
-
Weekly Merck led audits of work area safety done. Audits done with CM/Contractor participation.
-
SOR program in place, & feedback given to craft.
-
Emergency phone numbers posted in office areas and field.
-
Drinking water & wash facilities.
-
Toilet facilities available, accessible and clean.
Housekeeping:
-
Contractors inspect work areas daily.
-
Job site organized, not cluttered
-
Walking surfaces clear, clean, trip hazard eliminated
-
Trash / construction debris emptied regularly, disposal area neat, receptacles available.
-
Nails, scrap metal / wood picked up from previous days
-
Materials storage, proper segregation, stacked properly, chocked, no danger of falling.
-
Rodent, insect & vermin control
-
Site perimeter maintained
Personal Protective Equipment PPE:
-
Hard hats, safety glasses, class II high visibility work vest, safety toe work boot, task appropriate gloves meets GES requirements.
-
Safety glasses with secure side shields being worn.
-
Face shields / goggles worn where appropriate
-
Hearing protection used where appropriate
-
Glove program in effect & meets GES requirements
-
Back injury prevention (material handling)
-
Respirators / dust mask worn where appropriate, program in place, fit test etc
Fall Protection:
-
100% fall protection used above 6 feet (EU 2 m)
-
Full body harness worn (incl. high reaches) inspection certificates available
-
Fall protection equipment in good shape and inspected
-
Anchorage points for fall arrest meet required ratings
-
Lanyards with shock absorbers and double locking clips
-
Perimeter guarding provided, perimeter cables or wire rope properly installed
Fire Safety & Emergency Procedures:
-
Proper fire extinguishers available and inspected
-
Used rags in labeled metal cans with cover
-
All walkways, stairs, access, egress free of combustibles
-
Trained fire watch on duty during hot work - area monitored after hot work completed
-
Workers know evacuation alarm signals and evacuation routes
-
First aid kit policy established and followed (CM or contractor provided)
-
Eye wash stations provided in field
-
Sprinkler heads unobstructed
-
Temporary heaters, ventilation, dehumidifiers, lighting properly installed
General Safety:
-
Work area barricaded, access limited
-
PPE signs posted near access points, safety posters, signage, banners in field
-
Flaggers for mobile equipment movements
-
Containers, chemical materials labeled (labels legible)
-
Fuels, flammable materials stored properly
-
Temporary lights provided where needed. Adequate task lighting provided as appropriate.
-
Temporary power provided, in good working order
-
Equipment / tools in good working condition
-
Equipment / tool guards in place, where needed
Ladders / Stairs / Scaffolds:
-
Proper types of ladders being used
-
Ladders in good operating condition, inspected and stored properly
-
Conductive (metal) ladders not in use near elec.
-
Extension ladders tied off, and/or footed and secure, extended 36" (EU 1 m) above landing, 4/1 slope maintained
-
Workers not using top two steps on ladders
-
Stairs provided where needed >19" (EU >0.5 m), secured.
-
Stairs greater than 4 Risers equipped with hand rail
-
Scaffolds correct and rollers locked when in use, tagged correctly,inspected daily.
-
Toe boards, railing on scaffolds, where needed
-
Scaffold planking overlaps 12" (EU 0.3 m)
-
Safe access / egress for scaffolds
-
Working platforms at least 2 feet (EU 0.6 m) wide, Safe loading of platform.
-
Workers protected from falls off scaffolds by railing and workers below protect from falling hazards
-
Holes / penetrations protected with secured covers labeled HOLE or barricaded. Hole cover removal / replacement procedure in place.
-
Backup alarms, horns on mechanized equipment
Welding, Cutting:
-
Compressed gas cylinders secured with chain or wire
-
Cylinders capped when not in use
-
Oxygen and flammable gas cylinders kept 20 feet (EU 5 m) apart or approved 1/2 hour fire wall separation.
-
Torch, hoses, Gages, regulators and cables in good condition. Torch equipped with flash-back regulator
-
Hot work permit in use, fire watch established
-
No combustible material in vicinity of hot work.
-
Welding screens used where needed
Lifting / Rigging:
-
Lifting and crane area barricaded, no lifting over personal, rigger and Flagger in place
-
Crane usage approved, pre-lift checklist completed, operator certification on hand. Daily and annual crane inspection documented
-
Tag lines used to control loads
-
Rigging equipment used properly, in good condition
Excavation / Confined Spaces:
-
Trenches / excavations sloped properly or shored and barricaded
-
Adequate access in / out of excavations (max 25') (EU max 7.5 m)
-
Spoils, tools, etc kept 2 feet (EU 0.6 m) back from excavation edge
-
Soil classification identified
-
Ventilation used for confined spaces
-
Confined space; personnel properly trained
-
Confined space; retrieval equipment available and usedropriately
-
Confined space; standby attendant present, communication means available
-
Confined space; air monitoring (including continuous) performed
Motorized Equipment:
-
Mechanized equipment used properly
-
Proper inspections performed / documented
-
Rollover protection in place and maintained
-
Seat belts used by all operators
Electrical Safety:
-
Cords in good condition, no cuts or repairs W / tape cables secured and off floor to minimize trip hazard
-
All electric extension cords inspected within last month (color coding)
-
GFCIs used for lead cords, GFCIs tested monthly
-
Grounding in working order on power tools, equipment
-
Temp electrical panels labeled, grounded
-
Conduit tightly connected to junction / outlet box, all breakers labeled and field outlets w/ circuit#
-
Adequate illumination
-
Temporary wiring; power / lighting isolated from building structure and not presenting trip hazard
-
Precautions taken where overhead lines are present, no work within min 20' (EU 6 m) clear
Hazardous Work (Permits):
-
Required permits completed properly, posted
-
Fire watch present for high energy (class A) hot work
-
Flammable / combustible materials removed from hot work area
-
Hazardous energy sources locked out properly
Environmental:
-
Containment for petroleum products adequate and in good condition (no debris, rainwater accumulated)
-
Petroleum tank / containment inspections and inventory adequately documented
-
Documentation of Asbestos survey with negative results for demolition and renovation.
-
Storm sewers protected
-
Threading machine catch box in place
-
Drip pans in place for equipment such as generators and welders
-
Containers labeled & closed when not in use
-
Chemical storage away from storm sewers and on impervious surface
-
Appropriate environmental training and documentation.
-
Erosion and sedimentation control at project site (silt fences, tarps, mulching, as necessary)
-
Erosion and sedimentation control in soil management area (silt fences, tarps, mulching as necessary)
-
Erosion and sedimentation control inspections being completed and logged.
-
Environmental excavation permit number on excavation permit.
-
Roll-offs labeled (contents, date waste first placed in container, designated non-haz or hazardous waste)
-
Roll offs covered and in good condition.
-
Appropriate residual waste handling, accumulation and disposal
-
Appropriate hazardous waste handling
-
Ensure all hazardous wastes are removed from site by contractor unless otherwise specified.
-
Lay down in appropriate areas (not on unimproved landfill)
-
Truck/Vehicle wash in place. Concrete truck washout procedure followed.
-
Dust generation minimized / controlled
Other / Miscellaneous:
-
Safety culture measurement plan in place. (Hearts and minds)
-
Safety surveys are being done to gain feedback.
-
Safety mentoring program is in place
-
Comments and Notes: