Information
-
Client / Site
-
Conducted on
-
Location
-
Prepared by
Construction Barricades
-
Tacky walk-off mats in place & clean?
-
Barricade Doors have self-closers & latching hardware?
-
Doors closed & sealed properly?
-
Adjacent ceiling areas intact?
-
Adjacent floor is clean, no dust tracked out?
-
Barricades sealed, no penetrations (barricades extend from the floor, beyond the ceiling, to underside of the floor slab above)?
Ventilation
-
Ductwork sealed/closed?
-
Negative pressure at entrance to barricade?
-
All windows and doors closed behind barricade?
-
Negative air machines running?
-
Negative air machine filters clean?<br>
Jobsite
-
Project area clean, with debris removed daily?
-
Debris removed in suitable clean containers and covered daily as necessary?
-
Routes cleaned with wet-mop or HEPA vacuum?
-
Established traffic pattern identified and used?
-
Fire Extinguishers present?
Construction Personnel & Dress Code
-
Appropriate attire worn for construction project area (ie hardhat, eyewear, footwear, etc)?
-
Removing dust from clothing, shoes, and hair when entering the building?
-
Wearing Hackley Contractor ID Badges?
Additional Requirements
-
Water lines turned off at area adjacent to occupied Hospital area (is indicated by Project)?
-
Air flow monitoring (as indicated by IC)?
-
Daily temperature monitoring (if requested by IC)?
-
Daily humidity monitoring (if requested by IC)?
-
Air Particle Counts (if requested by IC)?
Traffic Control
-
Restricted to Construction personnel and necessary Staff only?
-
All doors and exits free of debris?
-
Exit routes posted?<br>
-
Construction signs posted?
-
Infection Control Permit posted?